F0/100

MINGO COUNTY PSD - NAUGATUCK — Water Quality Report 2026

Serving 2,159 people · West Virginia

Water Source
Surface Water
County
System ID
WV3303029
Violations
595

Contaminant Test Results

EPA Violation History

141

Violations (last 5yr)

52

Unresolved

9

Health-Related

TIER 3Unresolved

Failed to conduct Level 2 Assessment

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: September 29, 2025Rule: Stage 2 DBPRVerify on EPA.gov
TIER 3Unresolved

Failed to conduct Level 2 Assessment

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: September 29, 2025Rule: Stage 2 DBPRVerify on EPA.gov
TIER 3Unresolved

Disinfection byproduct treatment technique failure

When: July 12, 2025Rule: Ground Water RuleEnforcement: Informal — resolved cooperativelyVerify on EPA.gov
TIER 3Unresolved

Disinfection byproduct treatment technique failure

When: July 12, 2025Rule: Ground Water RuleEnforcement: Informal — resolved cooperativelyVerify on EPA.gov
TIER 2Unresolved

Exceeded the Maximum Contaminant Level (running average)

When: July 1, 2025 – September 30, 2025Rule: Stage 2 DBPREnforcement: Informal — resolved cooperativelyVerify on EPA.gov
TIER 3Resolved

Surface water treatment technique failure

When: July 1, 2025 – June 25, 2025Enforcement: Resolving — corrective action underway
TIER 2Unresolved

Exceeded the Maximum Contaminant Level (running average)

When: July 1, 2025 – September 30, 2025Rule: Stage 2 DBPREnforcement: Informal — resolved cooperativelyVerify on EPA.gov
TIER 2Unresolved

Exceeded the Maximum Contaminant Level (running average)

When: April 1, 2025 – June 30, 2025Rule: Stage 2 DBPREnforcement: Informal — resolved cooperativelyVerify on EPA.gov
TIER 2Unresolved

Exceeded the Maximum Contaminant Level (running average)

When: April 1, 2025 – June 30, 2025Rule: Stage 2 DBPREnforcement: Informal — resolved cooperativelyVerify on EPA.gov
TIER 3Unresolved

Disinfection byproduct treatment technique failure

When: February 15, 2025Rule: Ground Water RuleEnforcement: Informal — resolved cooperativelyVerify on EPA.gov
TIER 3Unresolved

Disinfection byproduct treatment technique failure

When: February 15, 2025Rule: Ground Water RuleEnforcement: Informal — resolved cooperativelyVerify on EPA.gov
TIER 3Unresolved

Failed Level 2 Assessment under Revised Total Coliform Rule

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: February 1, 2025 – February 28, 2025Rule: Stage 1 DBPREnforcement: Informal — resolved cooperativelyVerify on EPA.gov
TIER 3Unresolved

Monitoring Violation

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: February 1, 2025 – February 28, 2025Rule: Total Coliform RuleEnforcement: Informal — resolved cooperativelyVerify on EPA.gov
TIER 3Unresolved

Exceeded the MCL for disinfection byproducts

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: January 1, 2025 – March 31, 2025Enforcement: Informal — resolved cooperativelyVerify on EPA.gov
TIER 3Unresolved

Failed Level 2 Assessment under Revised Total Coliform Rule

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: January 1, 2025 – March 31, 2025Rule: Stage 2 DBPREnforcement: Informal — resolved cooperativelyVerify on EPA.gov
TIER 3Unresolved

Failed Level 2 Assessment under Revised Total Coliform Rule

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: January 1, 2025 – March 31, 2025Rule: Stage 2 DBPREnforcement: Informal — resolved cooperativelyVerify on EPA.gov
TIER 3Unresolved

Failed Level 2 Assessment under Revised Total Coliform Rule

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: January 1, 2025 – March 31, 2025Rule: Stage 1 DBPREnforcement: Informal — resolved cooperativelyVerify on EPA.gov
TIER 3Unresolved

Disinfection byproduct treatment technique failure

When: December 14, 2024Rule: Ground Water RuleEnforcement: Informal — resolved cooperativelyVerify on EPA.gov
TIER 3Unresolved

Disinfection byproduct treatment technique failure

When: October 3, 2024Rule: Ground Water RuleEnforcement: Informal — resolved cooperativelyVerify on EPA.gov
TIER 3Unresolved

Failed Level 2 Assessment under Revised Total Coliform Rule

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: October 1, 2024 – December 31, 2024Rule: Stage 1 DBPREnforcement: Informal — resolved cooperativelyVerify on EPA.gov
TIER 3Unresolved

Failed to issue ongoing public notification

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: October 1, 2024Rule: Ground Water RuleEnforcement: Informal — resolved cooperativelyVerify on EPA.gov
TIER 1 — URGENTUnresolved

Violation related to Nitrate

When: September 1, 2024 – September 30, 2024Rule: Surface Water Treatment RuleEnforcement: Informal — resolved cooperativelyVerify on EPA.gov
TIER 3Resolved

Surface water treatment technique failure

When: July 1, 2024 – September 12, 2024Enforcement: Resolving — corrective action underway
TIER 3Resolved

Disinfection byproduct treatment technique failure

When: February 15, 2024 – February 21, 2024Rule: Ground Water RuleEnforcement: Resolving — corrective action underway
TIER 3Resolved

Disinfection byproduct treatment technique failure

When: February 15, 2024 – February 21, 2024Rule: Ground Water RuleEnforcement: Resolving — corrective action underway
TIER 3Unresolved

Disinfection byproduct treatment technique failure

When: February 15, 2024Rule: Ground Water RuleEnforcement: Informal — resolved cooperativelyVerify on EPA.gov
TIER 3Resolved

Disinfection byproduct treatment technique failure

When: February 12, 2024 – February 21, 2024Rule: Ground Water RuleEnforcement: Resolving — corrective action underway
TIER 3Resolved

Disinfection byproduct treatment technique failure

When: February 12, 2024 – February 21, 2024Rule: Ground Water RuleEnforcement: Resolving — corrective action underway
TIER 3Resolved

Disinfection byproduct treatment technique failure

When: February 12, 2024 – February 21, 2024Rule: Ground Water RuleEnforcement: Resolving — corrective action underway
TIER 3Resolved

Disinfection byproduct treatment technique failure

When: February 12, 2024 – February 21, 2024Rule: Ground Water RuleEnforcement: Resolving — corrective action underway
TIER 3Resolved

Missed required monitoring deadline

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: December 1, 2023 – December 31, 2023Rule: Surface Water Treatment RuleEnforcement: Resolving — corrective action underway
TIER 3Resolved

Failed to complete routine monitoring

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: December 1, 2023 – December 31, 2023Rule: Surface Water Treatment RuleEnforcement: Resolving — corrective action underway
TIER 3Resolved

Disinfection byproduct treatment technique failure

When: November 16, 2023 – February 21, 2024Rule: Ground Water RuleEnforcement: Resolving — corrective action underway
TIER 3Resolved

Disinfection byproduct treatment technique failure

When: November 16, 2023 – February 21, 2024Rule: Ground Water RuleEnforcement: Resolving — corrective action underway
TIER 2Unresolved

Violation related to Lead and Copper Rule

When: November 2, 2023Rule: Surface Water Treatment RuleEnforcement: Informal — resolved cooperativelyVerify on EPA.gov
TIER 2Unresolved

Violation related to Lead and Copper Rule

When: November 2, 2023Rule: Surface Water Treatment RuleEnforcement: Informal — resolved cooperativelyVerify on EPA.gov
TIER 2Unresolved

Violation related to Lead and Copper Rule

When: November 2, 2023Rule: Surface Water Treatment RuleEnforcement: Informal — resolved cooperativelyVerify on EPA.gov
TIER 2Unresolved

Violation related to Lead and Copper Rule

When: November 2, 2023Rule: Surface Water Treatment RuleEnforcement: Informal — resolved cooperativelyVerify on EPA.gov
TIER 3Resolved

Disinfection byproduct treatment technique failure

When: October 15, 2023 – February 21, 2024Rule: Ground Water RuleEnforcement: Resolving — corrective action underway
TIER 3Resolved

Disinfection byproduct treatment technique failure

When: October 15, 2023 – February 21, 2024Rule: Ground Water RuleEnforcement: Resolving — corrective action underway
TIER 3Unresolved

Surface water treatment technique failure

When: October 1, 2023Enforcement: Informal — resolved cooperativelyVerify on EPA.gov
TIER 3Resolved

Failed to complete routine monitoring

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: October 1, 2023 – October 31, 2023Rule: Surface Water Treatment RuleEnforcement: Resolving — corrective action underway
TIER 3Resolved

Missed required monitoring deadline

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: October 1, 2023 – October 31, 2023Rule: Surface Water Treatment RuleEnforcement: Resolving — corrective action underway
TIER 3Resolved

Missed required monitoring deadline

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: October 1, 2023 – October 31, 2023Rule: Surface Water Treatment RuleEnforcement: Resolving — corrective action underway
TIER 3Unresolved

Failed to issue ongoing public notification

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: October 1, 2023Rule: Ground Water RuleEnforcement: Informal — resolved cooperativelyVerify on EPA.gov
TIER 3Resolved

Disinfection byproduct treatment technique failure

When: September 16, 2023 – February 21, 2024Rule: Ground Water RuleEnforcement: Resolving — corrective action underway
TIER 3Resolved

Disinfection byproduct treatment technique failure

When: September 16, 2023 – February 21, 2024Rule: Ground Water RuleEnforcement: Resolving — corrective action underway
TIER 3Resolved

Disinfection byproduct treatment technique failure

When: August 13, 2023 – February 21, 2024Rule: Ground Water RuleEnforcement: Resolving — corrective action underway
TIER 3Resolved

Disinfection byproduct treatment technique failure

When: August 13, 2023 – February 21, 2024Rule: Ground Water RuleEnforcement: Resolving — corrective action underway
TIER 3Resolved

Disinfection byproduct treatment technique failure

When: August 13, 2023 – February 21, 2024Rule: Ground Water RuleEnforcement: Resolving — corrective action underway
TIER 3Resolved

Disinfection byproduct treatment technique failure

When: August 13, 2023 – February 21, 2024Rule: Ground Water RuleEnforcement: Resolving — corrective action underway
TIER 3Resolved

Disinfection byproduct treatment technique failure

When: July 16, 2023 – February 21, 2024Rule: Ground Water RuleEnforcement: Resolving — corrective action underway
TIER 3Resolved

Disinfection byproduct treatment technique failure

When: July 16, 2023 – February 21, 2024Rule: Ground Water RuleEnforcement: Resolving — corrective action underway
TIER 3Unresolved

Surface water treatment technique failure

When: July 1, 2023Enforcement: Informal — resolved cooperativelyVerify on EPA.gov
TIER 3Resolved

Disinfection byproduct treatment technique failure

When: June 16, 2023 – February 21, 2024Rule: Ground Water RuleEnforcement: Resolving — corrective action underway
TIER 3Resolved

Disinfection byproduct treatment technique failure

When: June 16, 2023 – February 21, 2024Rule: Ground Water RuleEnforcement: Resolving — corrective action underway
TIER 3Resolved

Disinfection byproduct treatment technique failure

When: May 14, 2023 – February 21, 2024Rule: Ground Water RuleEnforcement: Resolving — corrective action underway
TIER 3Resolved

Disinfection byproduct treatment technique failure

When: May 14, 2023 – February 21, 2024Rule: Ground Water RuleEnforcement: Resolving — corrective action underway
TIER 3Resolved

Disinfection byproduct treatment technique failure

When: May 14, 2023 – February 21, 2024Rule: Ground Water RuleEnforcement: Resolving — corrective action underway
TIER 3Resolved

Missed required monitoring deadline

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: May 1, 2023 – May 31, 2023Rule: Surface Water Treatment RuleEnforcement: Resolving — corrective action underway
TIER 3Resolved

Failed to complete routine monitoring

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: May 1, 2023 – May 31, 2023Rule: Surface Water Treatment RuleEnforcement: Resolving — corrective action underway
TIER 3Resolved

Disinfection byproduct treatment technique failure

When: April 16, 2023 – February 21, 2024Rule: Ground Water RuleEnforcement: Resolving — corrective action underway
TIER 3Resolved

Disinfection byproduct treatment technique failure

When: April 16, 2023 – February 21, 2024Rule: Ground Water RuleEnforcement: Resolving — corrective action underway
TIER 3Resolved

Missed required monitoring deadline

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: April 1, 2023 – April 30, 2023Rule: Surface Water Treatment RuleEnforcement: Resolving — corrective action underway
TIER 3Resolved

Failed to complete routine monitoring

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: April 1, 2023 – April 30, 2023Rule: Surface Water Treatment RuleEnforcement: Resolving — corrective action underway
TIER 3Resolved

Disinfection byproduct treatment technique failure

When: March 16, 2023 – February 21, 2024Rule: Ground Water RuleEnforcement: Resolving — corrective action underway
TIER 3Resolved

Disinfection byproduct treatment technique failure

When: March 16, 2023 – February 21, 2024Rule: Ground Water RuleEnforcement: Resolving — corrective action underway
TIER 3Resolved

Missed required monitoring deadline

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: March 1, 2023 – March 31, 2023Rule: Surface Water Treatment RuleEnforcement: Resolving — corrective action underway
TIER 3Resolved

Failed to complete routine monitoring

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: March 1, 2023 – March 31, 2023Rule: Surface Water Treatment RuleEnforcement: Resolving — corrective action underway
TIER 3Resolved

Disinfection byproduct treatment technique failure

When: February 16, 2023 – February 21, 2024Rule: Ground Water RuleEnforcement: Resolving — corrective action underway
TIER 3Resolved

Disinfection byproduct treatment technique failure

When: February 16, 2023 – February 21, 2024Rule: Ground Water RuleEnforcement: Resolving — corrective action underway
TIER 3Resolved

Missed required monitoring deadline

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: February 1, 2023 – February 28, 2023Rule: Surface Water Treatment RuleEnforcement: Resolving — corrective action underway
TIER 3Resolved

Failed to complete routine monitoring

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: February 1, 2023 – February 28, 2023Rule: Surface Water Treatment RuleEnforcement: Resolving — corrective action underway
TIER 3Resolved

Disinfection byproduct treatment technique failure

When: January 15, 2023 – February 21, 2024Rule: Ground Water RuleEnforcement: Resolving — corrective action underway
TIER 3Resolved

Disinfection byproduct treatment technique failure

When: January 15, 2023 – February 21, 2024Rule: Ground Water RuleEnforcement: Resolving — corrective action underway
TIER 3Resolved

Failed to complete routine monitoring

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: January 1, 2023 – January 31, 2023Rule: Surface Water Treatment RuleEnforcement: Resolving — corrective action underway
TIER 3Resolved

Failed to complete routine monitoring

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: January 1, 2023 – January 31, 2023Rule: Surface Water Treatment RuleEnforcement: Resolving — corrective action underway
TIER 3Resolved

Monitoring Violation

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: January 1, 2023 – January 31, 2023Rule: Total Coliform RuleEnforcement: Resolving — corrective action underway
TIER 3Resolved

Missed required monitoring deadline

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: January 1, 2023 – January 31, 2023Rule: Surface Water Treatment RuleEnforcement: Resolving — corrective action underway
TIER 3Resolved

Failed Level 2 Assessment under Revised Total Coliform Rule

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: January 1, 2023 – March 31, 2023Rule: Stage 1 DBPREnforcement: Resolving — corrective action underway
TIER 3Resolved

Disinfection byproduct treatment technique failure

When: December 16, 2022 – February 21, 2024Rule: Ground Water RuleEnforcement: Resolving — corrective action underway
TIER 3Resolved

Disinfection byproduct treatment technique failure

When: December 16, 2022 – February 21, 2024Rule: Ground Water RuleEnforcement: Resolving — corrective action underway
TIER 3Resolved

Missed required monitoring deadline

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: December 1, 2022 – December 31, 2022Rule: Surface Water Treatment RuleEnforcement: Resolving — corrective action underway
TIER 3Resolved

Failed to complete routine monitoring

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: December 1, 2022 – December 31, 2022Rule: Surface Water Treatment RuleEnforcement: Resolving — corrective action underway
TIER 3Resolved

Disinfection byproduct treatment technique failure

When: November 15, 2022 – February 21, 2024Rule: Ground Water RuleEnforcement: Resolving — corrective action underway
TIER 3Resolved

Disinfection byproduct treatment technique failure

When: November 15, 2022 – February 21, 2024Rule: Ground Water RuleEnforcement: Resolving — corrective action underway
TIER 3Resolved

Disinfection byproduct treatment technique failure

When: November 15, 2022 – February 21, 2024Rule: Ground Water RuleEnforcement: Resolving — corrective action underway
TIER 3Resolved

Disinfection byproduct treatment technique failure

When: October 15, 2022 – February 21, 2024Rule: Ground Water RuleEnforcement: Resolving — corrective action underway
TIER 3Resolved

Disinfection byproduct treatment technique failure

When: October 15, 2022 – February 21, 2024Rule: Ground Water RuleEnforcement: Resolving — corrective action underway
TIER 3Unresolved

Surface water treatment technique failure

When: October 1, 2022Enforcement: Informal — resolved cooperativelyVerify on EPA.gov
TIER 3Resolved

Exceeded the MCL for disinfection byproducts

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: October 1, 2022 – December 31, 2022Enforcement: Resolving — corrective action underway
TIER 3Unresolved

Failed to issue ongoing public notification

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: October 1, 2022Rule: Ground Water RuleEnforcement: Informal — resolved cooperativelyVerify on EPA.gov
TIER 3Resolved

Disinfection byproduct treatment technique failure

When: September 16, 2022 – February 21, 2024Rule: Ground Water RuleEnforcement: Resolving — corrective action underway
TIER 3Resolved

Disinfection byproduct treatment technique failure

When: September 16, 2022 – February 21, 2024Rule: Ground Water RuleEnforcement: Resolving — corrective action underway
TIER 3Resolved

Disinfection byproduct treatment technique failure

When: August 14, 2022 – February 21, 2024Rule: Ground Water RuleEnforcement: Resolving — corrective action underway
TIER 3Resolved

Disinfection byproduct treatment technique failure

When: August 14, 2022 – February 21, 2024Rule: Ground Water RuleEnforcement: Resolving — corrective action underway
TIER 3Resolved

Disinfection byproduct treatment technique failure

When: August 14, 2022 – February 21, 2024Rule: Ground Water RuleEnforcement: Resolving — corrective action underway
TIER 3Resolved

Failed to complete routine monitoring

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: August 1, 2022 – August 31, 2022Rule: Surface Water Treatment RuleEnforcement: Resolving — corrective action underway
TIER 3Resolved

Missed required monitoring deadline

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: August 1, 2022 – August 31, 2022Rule: Surface Water Treatment RuleEnforcement: Resolving — corrective action underway
TIER 3Resolved

Missed required monitoring deadline

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: July 1, 2022 – July 31, 2022Rule: Surface Water Treatment RuleEnforcement: Resolving — corrective action underway
TIER 3Resolved

Failed to complete routine monitoring

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: July 1, 2022 – July 31, 2022Rule: Surface Water Treatment RuleEnforcement: Resolving — corrective action underway
TIER 3Unresolved

Failed Level 2 Assessment under Revised Total Coliform Rule

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: July 1, 2022 – September 30, 2022Rule: Stage 1 DBPREnforcement: Informal — resolved cooperativelyVerify on EPA.gov
TIER 3Resolved

Disinfection byproduct treatment technique failure

When: June 15, 2022 – February 21, 2024Rule: Ground Water RuleEnforcement: Resolving — corrective action underway
TIER 3Resolved

Disinfection byproduct treatment technique failure

When: June 15, 2022 – February 21, 2024Rule: Ground Water RuleEnforcement: Resolving — corrective action underway
TIER 3Resolved

Failed to complete routine monitoring

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: June 1, 2022 – June 30, 2022Rule: Surface Water Treatment RuleEnforcement: Resolving — corrective action underway
TIER 3Resolved

Missed required monitoring deadline

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: June 1, 2022 – June 30, 2022Rule: Surface Water Treatment RuleEnforcement: Resolving — corrective action underway
TIER 3Resolved

Missed required monitoring deadline

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: May 1, 2022 – May 31, 2022Rule: Surface Water Treatment RuleEnforcement: Resolving — corrective action underway
TIER 3Resolved

Failed to complete routine monitoring

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: May 1, 2022 – May 31, 2022Rule: Surface Water Treatment RuleEnforcement: Resolving — corrective action underway
TIER 3Resolved

Failed to complete routine monitoring

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: April 1, 2022 – April 30, 2022Rule: Surface Water Treatment RuleEnforcement: Resolving — corrective action underway
TIER 3Resolved

Missed required monitoring deadline

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: April 1, 2022 – April 30, 2022Rule: Surface Water Treatment RuleEnforcement: Resolving — corrective action underway
TIER 3Unresolved

Failed to complete routine monitoring

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: March 1, 2022 – March 31, 2022Rule: Surface Water Treatment RuleEnforcement: Formal — state order issuedVerify on EPA.gov
TIER 3Resolved

Failed Level 2 Assessment under Revised Total Coliform Rule

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: March 1, 2022 – May 31, 2022Rule: Stage 2 DBPREnforcement: Resolving — corrective action underway
TIER 3Unresolved

Missed required monitoring deadline

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: March 1, 2022 – March 31, 2022Rule: Surface Water Treatment RuleEnforcement: Formal — state order issuedVerify on EPA.gov
TIER 3Resolved

Failed Level 2 Assessment under Revised Total Coliform Rule

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: March 1, 2022 – May 31, 2022Rule: Stage 2 DBPREnforcement: Resolving — corrective action underway
TIER 3Unresolved

Failed to complete routine monitoring

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: February 1, 2022 – February 28, 2022Rule: Surface Water Treatment RuleEnforcement: Formal — state order issuedVerify on EPA.gov
TIER 3Unresolved

Missed required monitoring deadline

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: February 1, 2022 – February 28, 2022Rule: Surface Water Treatment RuleEnforcement: Formal — state order issuedVerify on EPA.gov
TIER 3Unresolved

Missed required monitoring deadline

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: January 1, 2022 – January 31, 2022Rule: Surface Water Treatment RuleEnforcement: Formal — state order issuedVerify on EPA.gov
TIER 3Unresolved

Failed to complete routine monitoring

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: January 1, 2022 – January 31, 2022Rule: Surface Water Treatment RuleEnforcement: Formal — state order issuedVerify on EPA.gov
TIER 3Resolved

Exceeded the MCL for disinfection byproducts

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: January 1, 2022 – March 31, 2022Enforcement: Formal — state order issued
TIER 3Unresolved

Failed to complete routine monitoring

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: December 1, 2021 – December 31, 2021Rule: Surface Water Treatment RuleEnforcement: Formal — state order issuedVerify on EPA.gov
TIER 3Unresolved

Missed required monitoring deadline

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: December 1, 2021 – December 31, 2021Rule: Surface Water Treatment RuleEnforcement: Formal — state order issuedVerify on EPA.gov
TIER 3Unresolved

Missed required monitoring deadline

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: November 1, 2021 – November 30, 2021Rule: Surface Water Treatment RuleEnforcement: Formal — state order issuedVerify on EPA.gov
TIER 3Unresolved

Failed to complete routine monitoring

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: November 1, 2021 – November 30, 2021Rule: Surface Water Treatment RuleEnforcement: Formal — state order issuedVerify on EPA.gov
TIER 3Unresolved

Failed to complete routine monitoring

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: October 1, 2021 – October 31, 2021Rule: Surface Water Treatment RuleEnforcement: Formal — state order issuedVerify on EPA.gov
TIER 3Unresolved

Missed required monitoring deadline

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: October 1, 2021 – October 31, 2021Rule: Surface Water Treatment RuleEnforcement: Formal — state order issuedVerify on EPA.gov
TIER 3Resolved

Failed to issue ongoing public notification

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: October 1, 2021Rule: Ground Water RuleEnforcement: Formal — state order issued
TIER 3Unresolved

Failed to complete routine monitoring

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: September 1, 2021 – September 30, 2021Rule: Surface Water Treatment RuleEnforcement: Formal — state order issuedVerify on EPA.gov
TIER 3Unresolved

Missed required monitoring deadline

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: September 1, 2021 – September 30, 2021Rule: Surface Water Treatment RuleEnforcement: Formal — state order issuedVerify on EPA.gov
TIER 3Resolved

Disinfection byproduct treatment technique failure

When: August 14, 2021 – February 21, 2024Rule: Ground Water RuleEnforcement: Formal — state order issued
TIER 3Resolved

Disinfection byproduct treatment technique failure

When: August 14, 2021 – February 21, 2024Rule: Ground Water RuleEnforcement: Formal — state order issued
TIER 3Resolved

Disinfection byproduct treatment technique failure

When: August 14, 2021 – February 21, 2024Rule: Ground Water RuleEnforcement: Formal — state order issued
TIER 3Resolved

Disinfection byproduct treatment technique failure

When: August 14, 2021 – February 21, 2024Rule: Ground Water RuleEnforcement: Formal — state order issued
TIER 3Unresolved

Failed to complete routine monitoring

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: August 1, 2021 – August 31, 2021Rule: Surface Water Treatment RuleEnforcement: Formal — state order issuedVerify on EPA.gov
TIER 3Unresolved

Missed required monitoring deadline

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: August 1, 2021 – August 31, 2021Rule: Surface Water Treatment RuleEnforcement: Formal — state order issuedVerify on EPA.gov
TIER 3Resolved

Disinfection byproduct treatment technique failure

When: July 15, 2021Rule: Ground Water RuleEnforcement: Formal — state order issued
TIER 3Unresolved

Missed required monitoring deadline

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: July 1, 2021 – July 31, 2021Rule: Surface Water Treatment RuleEnforcement: Formal — state order issuedVerify on EPA.gov
TIER 3Unresolved

Failed to complete routine monitoring

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: July 1, 2021 – July 31, 2021Rule: Surface Water Treatment RuleEnforcement: Formal — state order issuedVerify on EPA.gov
TIER 3Unresolved

Failed to complete routine monitoring

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: June 1, 2021 – June 30, 2021Rule: Surface Water Treatment RuleEnforcement: Formal — state order issuedVerify on EPA.gov
TIER 3Unresolved

Missed required monitoring deadline

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: June 1, 2021 – June 30, 2021Rule: Surface Water Treatment RuleEnforcement: Formal — state order issuedVerify on EPA.gov
TIER 3Resolved

Disinfection byproduct treatment technique failure

When: April 15, 2021 – February 21, 2024Rule: Ground Water RuleEnforcement: Formal — state order issued
TIER 3Resolved

Disinfection byproduct treatment technique failure

When: April 15, 2021 – February 21, 2024Rule: Ground Water RuleEnforcement: Formal — state order issued

Understanding violation severity

Tier 1Urgent health risk. Utility must notify all customers within 24 hours.Tier 2Important health or treatment issue. Customers notified within 30 days.Tier 3Administrative or monitoring issue. Reported in the annual water quality report.

Source: EPA Safe Drinking Water Information System (SDWIS) · Updated quarterly

Frequently Asked Questions About MINGO COUNTY PSD - NAUGATUCK

Is MINGO COUNTY PSD - NAUGATUCK water safe to drink?

MINGO COUNTY PSD - NAUGATUCK water receives a grade of F (0/100), which is considered failing. 0 contaminant(s) exceed EPA legal limits and 595 violation(s) are on record. Customers may want to consider using a water filter.

What contaminants has MINGO COUNTY PSD - NAUGATUCK detected?

31 contaminants were tested in MINGO COUNTY PSD - NAUGATUCK's water. No contaminants exceed EPA legal limits or health goals, indicating good water quality management.

Does MINGO COUNTY PSD - NAUGATUCK have any EPA violations?

Yes, MINGO COUNTY PSD - NAUGATUCK has 595 EPA violation(s) on record, with the most recent in 2025. Violation types include MR, Other, MCL. 13 are health-based violations.

How many people does MINGO COUNTY PSD - NAUGATUCK serve?

MINGO COUNTY PSD - NAUGATUCK serves approximately 2,159 people, West Virginia. The system provides water to 1 community: Naugatuck.

What type of water does MINGO COUNTY PSD - NAUGATUCK provide?

MINGO COUNTY PSD - NAUGATUCK sources its water from surface water. Surface water comes from rivers, lakes, or reservoirs and typically requires more extensive treatment. The utility's system ID is WV3303029.

How does MINGO COUNTY PSD - NAUGATUCK compare to other utilities in West Virginia?

MINGO COUNTY PSD - NAUGATUCK scores 0/100 with a grade of F (failing). This score suggests significant water quality concerns relative to other utilities. Visit our West Virginia state page for a full comparison of water systems.

Cities Served