TIER 3 Unresolved
Disinfection byproduct treatment technique failure
When: September 13, 2025Rule: Ground Water RuleVerify on EPA.gov TIER 3 Unresolved
Surface water treatment technique failure
When: July 1, 2025Enforcement: Informal — resolved cooperativelyVerify on EPA.gov TIER 3 Unresolved
Failed to issue ongoing public notification
This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.
When: July 1, 2025Rule: Ground Water RuleEnforcement: Informal — resolved cooperativelyVerify on EPA.gov TIER 3 Unresolved
Disinfection byproduct treatment technique failure
When: June 13, 2025Rule: Ground Water RuleEnforcement: Informal — resolved cooperativelyVerify on EPA.gov TIER 3 Unresolved
Violation related to Consumer Confidence Report
This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.
When: May 1, 2025 – May 31, 2025Rule: Consumer Confidence RuleEnforcement: Informal — resolved cooperativelyVerify on EPA.gov TIER 3 Unresolved
Missed required monitoring deadline
This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.
When: May 1, 2025 – May 31, 2025Rule: Surface Water Treatment RuleEnforcement: Informal — resolved cooperativelyVerify on EPA.gov TIER 2 Unresolved
Failed treatment technique requirements
When: March 1, 2025 – March 31, 2025Rule: Consumer Confidence RuleEnforcement: Informal — resolved cooperativelyVerify on EPA.gov TIER 3 Unresolved
Disinfection byproduct treatment technique failure
When: February 15, 2025Rule: Ground Water RuleEnforcement: Informal — resolved cooperativelyVerify on EPA.gov TIER 3 Unresolved
Disinfection byproduct treatment technique failure
When: February 15, 2025Rule: Ground Water RuleEnforcement: Informal — resolved cooperativelyVerify on EPA.gov TIER 3 Unresolved
Disinfection byproduct treatment technique failure
When: February 15, 2025Rule: Ground Water RuleEnforcement: Informal — resolved cooperativelyVerify on EPA.gov TIER 3 Unresolved
Disinfection byproduct treatment technique failure
When: February 15, 2025Rule: Ground Water RuleEnforcement: Informal — resolved cooperativelyVerify on EPA.gov TIER 3 Unresolved
Disinfection byproduct treatment technique failure
When: February 15, 2025Rule: Ground Water RuleEnforcement: Informal — resolved cooperativelyVerify on EPA.gov TIER 3 Unresolved
Disinfection byproduct treatment technique failure
When: February 15, 2025Rule: Ground Water RuleEnforcement: Informal — resolved cooperativelyVerify on EPA.gov TIER 3 Unresolved
Disinfection byproduct treatment technique failure
When: February 15, 2025Rule: Ground Water RuleEnforcement: Informal — resolved cooperativelyVerify on EPA.gov TIER 3 Unresolved
Disinfection byproduct treatment technique failure
When: February 15, 2025Rule: Ground Water RuleEnforcement: Informal — resolved cooperativelyVerify on EPA.gov TIER 3 Unresolved
Disinfection byproduct treatment technique failure
When: February 15, 2025Rule: Ground Water RuleEnforcement: Informal — resolved cooperativelyVerify on EPA.gov TIER 3 Unresolved
Disinfection byproduct treatment technique failure
When: February 15, 2025Rule: Ground Water RuleEnforcement: Informal — resolved cooperativelyVerify on EPA.gov TIER 3 Unresolved
Disinfection byproduct treatment technique failure
When: February 15, 2025Rule: Ground Water RuleEnforcement: Informal — resolved cooperativelyVerify on EPA.gov TIER 3 Unresolved
Disinfection byproduct treatment technique failure
When: February 15, 2025Rule: Ground Water RuleEnforcement: Informal — resolved cooperativelyVerify on EPA.gov TIER 3 Unresolved
Disinfection byproduct treatment technique failure
When: February 15, 2025Rule: Ground Water RuleEnforcement: Informal — resolved cooperativelyVerify on EPA.gov TIER 3 Unresolved
Violation related to Consumer Confidence Report
This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.
When: February 1, 2025 – February 28, 2025Rule: Consumer Confidence RuleEnforcement: Informal — resolved cooperativelyVerify on EPA.gov TIER 3 Unresolved
Failed to issue ongoing public notification
This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.
When: January 1, 2025Rule: Ground Water RuleEnforcement: Informal — resolved cooperativelyVerify on EPA.gov TIER 3 Unresolved
Disinfection byproduct treatment technique failure
When: November 14, 2024Rule: Ground Water RuleEnforcement: Informal — resolved cooperativelyVerify on EPA.gov TIER 3 Unresolved
Disinfection byproduct treatment technique failure
When: September 12, 2024Rule: Ground Water RuleEnforcement: Informal — resolved cooperativelyVerify on EPA.gov TIER 3 Resolved
Violation related to Consumer Confidence Report
This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.
When: September 1, 2024 – September 30, 2024Rule: Consumer Confidence RuleEnforcement: Resolving — corrective action underway
TIER 3 Unresolved
Disinfection byproduct treatment technique failure
When: August 15, 2024Rule: Ground Water RuleEnforcement: Informal — resolved cooperativelyVerify on EPA.gov TIER 3 Resolved
Failed to complete routine monitoring
This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.
When: July 1, 2024 – July 31, 2024Rule: Surface Water Treatment RuleEnforcement: Resolving — corrective action underway
TIER 3 Unresolved
Surface water treatment technique failure
When: July 1, 2024Enforcement: Informal — resolved cooperativelyVerify on EPA.gov TIER 3 Unresolved
Monitoring / Reporting Violation
This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.
When: March 31, 2024Rule: Ground Water RuleEnforcement: Informal — resolved cooperativelyVerify on EPA.gov TIER 3 Unresolved
Disinfection byproduct treatment technique failure
When: February 16, 2024Rule: Ground Water RuleEnforcement: Informal — resolved cooperativelyVerify on EPA.gov TIER 3 Unresolved
Disinfection byproduct treatment technique failure
When: February 16, 2024Rule: Ground Water RuleEnforcement: Informal — resolved cooperativelyVerify on EPA.gov TIER 3 Unresolved
Disinfection byproduct treatment technique failure
When: February 16, 2024Rule: Ground Water RuleEnforcement: Informal — resolved cooperativelyVerify on EPA.gov TIER 3 Unresolved
Disinfection byproduct treatment technique failure
When: November 16, 2023Rule: Ground Water RuleEnforcement: Informal — resolved cooperativelyVerify on EPA.gov TIER 3 Unresolved
Disinfection byproduct treatment technique failure
When: November 16, 2023Rule: Ground Water RuleEnforcement: Informal — resolved cooperativelyVerify on EPA.gov TIER 3 Resolved
Violation related to Consumer Confidence Report
This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.
When: September 1, 2023 – September 30, 2023Rule: Consumer Confidence RuleEnforcement: Resolving — corrective action underway
TIER 3 Unresolved
Disinfection byproduct treatment technique failure
When: August 12, 2023Rule: Ground Water RuleEnforcement: Informal — resolved cooperativelyVerify on EPA.gov TIER 3 Unresolved
Surface water treatment technique failure
When: July 1, 2023Enforcement: Informal — resolved cooperativelyVerify on EPA.gov TIER 3 Resolved
Missed required monitoring deadline
This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.
When: July 1, 2023 – July 31, 2023Rule: Surface Water Treatment RuleEnforcement: Resolving — corrective action underway
TIER 3 Resolved
Failed to issue ongoing public notification
This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.
When: July 1, 2023 – December 26, 2023Rule: Ground Water RuleEnforcement: Resolving — corrective action underway
TIER 3 Resolved
Exceeded the MCL for disinfection byproducts
This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.
When: January 1, 2023 – November 9, 2023Rule: Revised Total Coliform RuleEnforcement: Resolving — corrective action underway
TIER 3 Resolved
Exceeded the MCL for disinfection byproducts
This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.
When: January 1, 2023 – November 9, 2023Rule: Revised Total Coliform RuleEnforcement: Resolving — corrective action underway
TIER 3 Resolved
Exceeded the MCL for disinfection byproducts
This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.
When: January 1, 2023 – December 31, 2023Enforcement: Resolving — corrective action underway
TIER 3 Resolved
Exceeded the MCL for disinfection byproducts
This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.
When: January 1, 2023 – December 31, 2023Enforcement: Resolving — corrective action underway
TIER 3 Resolved
Exceeded the MCL for disinfection byproducts
This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.
When: January 1, 2023 – December 31, 2023Enforcement: Resolving — corrective action underway
TIER 3 Resolved
Exceeded the MCL for disinfection byproducts
This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.
When: January 1, 2023 – December 31, 2023Enforcement: Resolving — corrective action underway
TIER 3 Resolved
Exceeded the MCL for disinfection byproducts
This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.
When: January 1, 2023 – December 31, 2023Enforcement: Resolving — corrective action underway
TIER 3 Resolved
Exceeded the MCL for disinfection byproducts
This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.
When: January 1, 2023 – December 31, 2023Enforcement: Resolving — corrective action underway
TIER 3 Resolved
Exceeded the MCL for disinfection byproducts
This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.
When: January 1, 2023 – December 31, 2023Enforcement: Resolving — corrective action underway
TIER 3 Resolved
Exceeded the MCL for disinfection byproducts
This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.
When: January 1, 2023 – December 31, 2023Enforcement: Resolving — corrective action underway
TIER 3 Resolved
Exceeded the MCL for disinfection byproducts
This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.
When: January 1, 2023 – November 9, 2023Rule: Revised Total Coliform RuleEnforcement: Resolving — corrective action underway
TIER 3 Resolved
Exceeded the MCL for disinfection byproducts
This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.
When: January 1, 2023 – November 9, 2023Rule: Revised Total Coliform RuleEnforcement: Resolving — corrective action underway
TIER 3 Resolved
Exceeded the MCL for disinfection byproducts
This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.
When: January 1, 2023 – December 31, 2023Enforcement: Resolving — corrective action underway
TIER 3 Resolved
Exceeded the MCL for disinfection byproducts
This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.
When: January 1, 2023 – November 9, 2023Rule: Revised Total Coliform RuleEnforcement: Resolving — corrective action underway
TIER 3 Resolved
Exceeded the MCL for disinfection byproducts
This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.
When: January 1, 2023 – November 9, 2023Rule: Revised Total Coliform RuleEnforcement: Resolving — corrective action underway
TIER 3 Resolved
Exceeded the MCL for disinfection byproducts
This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.
When: January 1, 2023 – November 9, 2023Rule: Revised Total Coliform RuleEnforcement: Resolving — corrective action underway
TIER 3 Resolved
Exceeded the MCL for disinfection byproducts
This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.
When: January 1, 2023 – November 9, 2023Rule: Revised Total Coliform RuleEnforcement: Resolving — corrective action underway
TIER 3 Resolved
Exceeded the MCL for disinfection byproducts
This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.
When: January 1, 2023 – November 9, 2023Rule: Revised Total Coliform RuleEnforcement: Resolving — corrective action underway
TIER 3 Resolved
Exceeded the MCL for disinfection byproducts
This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.
When: January 1, 2023 – November 9, 2023Rule: Revised Total Coliform RuleEnforcement: Resolving — corrective action underway
TIER 3 Resolved
Exceeded the MCL for disinfection byproducts
This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.
When: January 1, 2023 – November 9, 2023Rule: Revised Total Coliform RuleEnforcement: Resolving — corrective action underway
TIER 3 Resolved
Exceeded the MCL for disinfection byproducts
This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.
When: January 1, 2023 – November 9, 2023Rule: Revised Total Coliform RuleEnforcement: Resolving — corrective action underway
TIER 3 Resolved
Exceeded the MCL for disinfection byproducts
This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.
When: January 1, 2023 – November 9, 2023Rule: Revised Total Coliform RuleEnforcement: Resolving — corrective action underway
TIER 3 Resolved
Exceeded the MCL for disinfection byproducts
This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.
When: January 1, 2023 – November 9, 2023Rule: Revised Total Coliform RuleEnforcement: Resolving — corrective action underway
TIER 3 Resolved
Exceeded the MCL for disinfection byproducts
This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.
When: January 1, 2023 – November 9, 2023Rule: Revised Total Coliform RuleEnforcement: Resolving — corrective action underway
TIER 3 Resolved
Exceeded the MCL for disinfection byproducts
This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.
When: January 1, 2023 – November 9, 2023Rule: Revised Total Coliform RuleEnforcement: Resolving — corrective action underway
TIER 3 Resolved
Exceeded the MCL for disinfection byproducts
This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.
When: January 1, 2023 – November 9, 2023Rule: Revised Total Coliform RuleEnforcement: Resolving — corrective action underway
TIER 3 Resolved
Exceeded the MCL for disinfection byproducts
This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.
When: January 1, 2023 – November 9, 2023Rule: Revised Total Coliform RuleEnforcement: Resolving — corrective action underway
TIER 3 Resolved
Exceeded the MCL for disinfection byproducts
This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.
When: January 1, 2023 – November 9, 2023Rule: Revised Total Coliform RuleEnforcement: Resolving — corrective action underway
TIER 3 Resolved
Exceeded the MCL for disinfection byproducts
This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.
When: January 1, 2023 – November 9, 2023Rule: Revised Total Coliform RuleEnforcement: Resolving — corrective action underway
TIER 3 Resolved
Exceeded the MCL for disinfection byproducts
This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.
When: January 1, 2023 – November 9, 2023Rule: Revised Total Coliform RuleEnforcement: Resolving — corrective action underway
TIER 3 Resolved
Exceeded the MCL for disinfection byproducts
This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.
When: January 1, 2023 – November 9, 2023Rule: Revised Total Coliform RuleEnforcement: Resolving — corrective action underway
TIER 3 Resolved
Exceeded the MCL for disinfection byproducts
This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.
When: January 1, 2023 – November 9, 2023Rule: Revised Total Coliform RuleEnforcement: Resolving — corrective action underway
TIER 3 Resolved
Exceeded the MCL for disinfection byproducts
This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.
When: January 1, 2023 – November 9, 2023Rule: Revised Total Coliform RuleEnforcement: Resolving — corrective action underway
TIER 3 Resolved
Exceeded the MCL for disinfection byproducts
This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.
When: January 1, 2023 – November 9, 2023Rule: Revised Total Coliform RuleEnforcement: Resolving — corrective action underway
TIER 3 Resolved
Exceeded the MCL for disinfection byproducts
This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.
When: January 1, 2023 – November 9, 2023Rule: Revised Total Coliform RuleEnforcement: Resolving — corrective action underway
TIER 3 Resolved
Exceeded the MCL for disinfection byproducts
This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.
When: January 1, 2023 – November 9, 2023Rule: Revised Total Coliform RuleEnforcement: Resolving — corrective action underway
TIER 3 Resolved
Exceeded the MCL for disinfection byproducts
This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.
When: January 1, 2023 – November 9, 2023Rule: Revised Total Coliform RuleEnforcement: Resolving — corrective action underway
TIER 3 Resolved
Exceeded the MCL for disinfection byproducts
This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.
When: January 1, 2023 – November 9, 2023Rule: Revised Total Coliform RuleEnforcement: Resolving — corrective action underway
TIER 3 Resolved
Exceeded the MCL for disinfection byproducts
This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.
When: January 1, 2023 – November 9, 2023Rule: Revised Total Coliform RuleEnforcement: Resolving — corrective action underway
TIER 3 Resolved
Exceeded the MCL for disinfection byproducts
This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.
When: January 1, 2023 – November 9, 2023Rule: Revised Total Coliform RuleEnforcement: Resolving — corrective action underway
TIER 3 Resolved
Exceeded the MCL for disinfection byproducts
This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.
When: January 1, 2023 – November 9, 2023Rule: Revised Total Coliform RuleEnforcement: Resolving — corrective action underway
TIER 3 Resolved
Exceeded the MCL for disinfection byproducts
This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.
When: January 1, 2023 – December 31, 2023Enforcement: Resolving — corrective action underway
TIER 3 Resolved
Exceeded the MCL for disinfection byproducts
This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.
When: January 1, 2023 – November 9, 2023Rule: Revised Total Coliform RuleEnforcement: Resolving — corrective action underway
TIER 3 Resolved
Failed to issue ongoing public notification
This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.
When: January 1, 2023 – December 26, 2023Rule: Ground Water RuleEnforcement: Resolving — corrective action underway
TIER 3 Resolved
Exceeded the MCL for disinfection byproducts
This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.
When: January 1, 2023 – November 9, 2023Rule: Revised Total Coliform RuleEnforcement: Resolving — corrective action underway
TIER 3 Resolved
Exceeded the MCL for disinfection byproducts
This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.
When: January 1, 2023 – November 9, 2023Rule: Revised Total Coliform RuleEnforcement: Resolving — corrective action underway
TIER 3 Resolved
Exceeded the MCL for disinfection byproducts
This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.
When: January 1, 2023 – November 9, 2023Rule: Revised Total Coliform RuleEnforcement: Resolving — corrective action underway
TIER 3 Resolved
Exceeded the MCL for disinfection byproducts
This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.
When: January 1, 2023 – November 9, 2023Rule: Revised Total Coliform RuleEnforcement: Resolving — corrective action underway
TIER 3 Resolved
Exceeded the MCL for disinfection byproducts
This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.
When: January 1, 2023 – November 9, 2023Rule: Revised Total Coliform RuleEnforcement: Resolving — corrective action underway
TIER 3 Resolved
Exceeded the MCL for disinfection byproducts
This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.
When: January 1, 2023 – November 9, 2023Rule: Revised Total Coliform RuleEnforcement: Resolving — corrective action underway
TIER 3 Resolved
Exceeded the MCL for disinfection byproducts
This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.
When: January 1, 2023 – November 9, 2023Rule: Revised Total Coliform RuleEnforcement: Resolving — corrective action underway
TIER 3 Resolved
Exceeded the MCL for disinfection byproducts
This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.
When: January 1, 2023 – December 31, 2023Enforcement: Resolving — corrective action underway
TIER 3 Resolved
Exceeded the MCL for disinfection byproducts
This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.
When: January 1, 2023 – November 9, 2023Rule: Revised Total Coliform RuleEnforcement: Resolving — corrective action underway
TIER 3 Resolved
Exceeded the MCL for disinfection byproducts
This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.
When: January 1, 2023 – November 9, 2023Rule: Revised Total Coliform RuleEnforcement: Resolving — corrective action underway
TIER 3 Resolved
Failed Level 2 Assessment under Revised Total Coliform Rule
This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.
When: October 1, 2022 – December 31, 2022Rule: Stage 2 DBPREnforcement: Resolving — corrective action underway
TIER 3 Resolved
Failed Level 2 Assessment under Revised Total Coliform Rule
This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.
When: October 1, 2022 – December 31, 2022Rule: Stage 2 DBPREnforcement: Resolving — corrective action underway
TIER 3 Unresolved
Monitoring / Reporting Violation
This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.
When: September 29, 2022Rule: Ground Water RuleEnforcement: Informal — resolved cooperativelyVerify on EPA.gov TIER 3 Unresolved
Disinfection byproduct treatment technique failure
When: August 13, 2022Rule: Ground Water RuleEnforcement: Informal — resolved cooperativelyVerify on EPA.gov TIER 3 Resolved
Failed to issue ongoing public notification
This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.
When: July 1, 2022 – December 26, 2023Rule: Ground Water RuleEnforcement: Resolving — corrective action underway
TIER 3 Resolved
Failed Level 2 Assessment under Revised Total Coliform Rule
This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.
When: May 1, 2022 – July 31, 2022Rule: Stage 2 DBPREnforcement: Resolving — corrective action underway
TIER 3 Resolved
Failed Level 2 Assessment under Revised Total Coliform Rule
This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.
When: May 1, 2022 – July 31, 2022Rule: Stage 2 DBPREnforcement: Resolving — corrective action underway
TIER 3 Unresolved
Disinfection byproduct treatment technique failure
When: February 12, 2022Rule: Ground Water RuleEnforcement: Informal — resolved cooperativelyVerify on EPA.gov TIER 3 Unresolved
Disinfection byproduct treatment technique failure
When: February 12, 2022Rule: Ground Water RuleEnforcement: Informal — resolved cooperativelyVerify on EPA.gov TIER 3 Unresolved
Disinfection byproduct treatment technique failure
When: February 12, 2022Rule: Ground Water RuleEnforcement: Informal — resolved cooperativelyVerify on EPA.gov TIER 3 Unresolved
Disinfection byproduct treatment technique failure
When: February 12, 2022Rule: Ground Water RuleEnforcement: Informal — resolved cooperativelyVerify on EPA.gov TIER 3 Unresolved
Disinfection byproduct treatment technique failure
When: February 12, 2022Rule: Ground Water RuleEnforcement: Informal — resolved cooperativelyVerify on EPA.gov TIER 3 Unresolved
Disinfection byproduct treatment technique failure
When: February 12, 2022Rule: Ground Water RuleEnforcement: Informal — resolved cooperativelyVerify on EPA.gov TIER 3 Unresolved
Disinfection byproduct treatment technique failure
When: November 13, 2021Rule: Ground Water RuleEnforcement: Informal — resolved cooperativelyVerify on EPA.gov TIER 3 Resolved
Failed to issue ongoing public notification
This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.
When: July 1, 2021 – December 26, 2023Rule: Ground Water RuleEnforcement: Resolving — corrective action underway