B62/100

TDCJ RAMSEY AREA — Water Quality Report 2026

Serving 5,119 people · Texas

Water Source
Groundwater
County
System ID
TX0200201
Violations
19

Contaminant Test Results

1 contaminant above EPA health goals
ContaminantDetectedLimit (MCL)Status
Lead (90th percentile)
0.002 mg/L0.015 mg/LAbove Goal

EPA Violation History

10

Violations (last 5yr)

1

Unresolved

1

Health-Related

TIER 3Unresolved

Monitoring / Reporting Violation

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: September 29, 2025Rule: Ground Water RuleVerify on EPA.gov
TIER 3Resolved

Disinfection byproduct treatment technique failure

When: May 15, 2025 – April 24, 2025Rule: Ground Water RuleEnforcement: Resolving — corrective action underway
TIER 3Resolved

Failed to issue ongoing public notification

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: January 1, 2025 – June 30, 2025Rule: Ground Water RuleEnforcement: Resolving — corrective action underway
TIER 3Resolved

Disinfection byproduct treatment technique failure

When: December 1, 2024 – February 21, 2025Rule: Ground Water RuleEnforcement: Resolving — corrective action underway
TIER 3Resolved

Reporting violation

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: October 17, 2024 – March 17, 2025Rule: Ground Water RuleEnforcement: Resolving — corrective action underway
TIER 2Resolved

Treatment technique violation

When: October 17, 2024 – March 17, 2025Rule: Ground Water RuleEnforcement: Resolving — corrective action underway
TIER 3Resolved

Failed to issue ongoing public notification

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: July 1, 2024 – June 30, 2025Rule: Ground Water RuleEnforcement: Resolving — corrective action underway
TIER 3Resolved

Failed to issue ongoing public notification

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: October 1, 2023 – June 30, 2025Rule: Ground Water RuleEnforcement: Resolving — corrective action underway
TIER 3Resolved

Disinfection byproduct treatment technique failure

When: June 16, 2022 – February 21, 2025Rule: Ground Water RuleEnforcement: Resolving — corrective action underway
TIER 3Resolved

Monitoring Violation

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: June 1, 2021 – June 30, 2021Rule: Total Coliform RuleEnforcement: Resolving — corrective action underway

Understanding violation severity

Tier 1Urgent health risk. Utility must notify all customers within 24 hours.Tier 2Important health or treatment issue. Customers notified within 30 days.Tier 3Administrative or monitoring issue. Reported in the annual water quality report.

Source: EPA Safe Drinking Water Information System (SDWIS) · Updated quarterly

Frequently Asked Questions About TDCJ RAMSEY AREA

Is TDCJ RAMSEY AREA water safe to drink?

TDCJ RAMSEY AREA water receives a grade of B (62/100), which is considered good. Out of 31 contaminants tested, none exceed EPA legal limits. 1 contaminant(s) exceed non-enforceable health goals. The water meets federal safety standards.

What contaminants has TDCJ RAMSEY AREA detected?

31 contaminants were tested in TDCJ RAMSEY AREA's water. Notable contaminants include Lead (90th percentile). No contaminants exceed EPA legal limits. 1 exceed EPA health goals (MCLGs).

Does TDCJ RAMSEY AREA have any EPA violations?

Yes, TDCJ RAMSEY AREA has 19 EPA violation(s) on record, with the most recent in 2025. Violation types include MR, Other, RPT. 4 are health-based violations.

How many people does TDCJ RAMSEY AREA serve?

TDCJ RAMSEY AREA serves approximately 5,119 people, Texas.

What type of water does TDCJ RAMSEY AREA provide?

TDCJ RAMSEY AREA sources its water from groundwater. Groundwater is pumped from underground aquifers, which often provides natural filtration. The utility's system ID is TX0200201.

How does TDCJ RAMSEY AREA compare to other utilities in Texas?

TDCJ RAMSEY AREA scores 62/100 with a grade of B (good). This is an above-average performance for utilities statewide. Visit our Texas state page for a full comparison of water systems.