TIER 3 Unresolved
Disinfection byproduct treatment technique failure
When: July 30, 2025Rule: Ground Water RuleEnforcement: Informal — resolved cooperativelyVerify on EPA.gov TIER 2 Unresolved
Exceeded the Maximum Contaminant Level (running average)
When: July 1, 2025 – September 30, 2025Rule: Stage 2 DBPREnforcement: Formal — state order issuedVerify on EPA.gov TIER 3 Unresolved
Failed to issue ongoing public notification
This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.
When: July 1, 2025Rule: Ground Water RuleEnforcement: Informal — resolved cooperativelyVerify on EPA.gov TIER 3 Unresolved
Disinfection byproduct treatment technique failure
When: May 15, 2025Rule: Ground Water RuleEnforcement: Informal — resolved cooperativelyVerify on EPA.gov TIER 2 Unresolved
Exceeded the Maximum Contaminant Level (running average)
When: April 1, 2025 – June 30, 2025Rule: Stage 2 DBPREnforcement: Formal — state order issuedVerify on EPA.gov TIER 3 Unresolved
Failed Level 2 Assessment under Revised Total Coliform Rule
This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.
When: April 1, 2025 – June 30, 2025Rule: Stage 1 DBPRVerify on EPA.gov TIER 3 Unresolved
Disinfection byproduct treatment technique failure
When: March 8, 2025Rule: Ground Water RuleEnforcement: Informal — resolved cooperativelyVerify on EPA.gov TIER 2 Unresolved
Exceeded the Maximum Contaminant Level (running average)
When: January 1, 2025 – March 31, 2025Rule: Stage 2 DBPREnforcement: Formal — state order issuedVerify on EPA.gov TIER 3 Resolved
Reporting violation
This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.
When: October 17, 2024 – April 22, 2025Rule: Ground Water RuleEnforcement: Resolving — corrective action underway
TIER 2 Resolved
Treatment technique violation
When: October 17, 2024 – April 22, 2025Rule: Ground Water RuleEnforcement: Resolving — corrective action underway
TIER 3 Unresolved
Failed to issue ongoing public notification
This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.
When: October 1, 2024Rule: Ground Water RuleEnforcement: Informal — resolved cooperativelyVerify on EPA.gov TIER 3 Resolved
Disinfection byproduct treatment technique failure
When: July 24, 2024 – September 26, 2024Rule: Ground Water RuleEnforcement: Resolving — corrective action underway
TIER 3 Resolved
Surface water treatment technique failure
When: July 1, 2024 – September 26, 2024Enforcement: Resolving — corrective action underway
TIER 2 Resolved
Exceeded the Maximum Contaminant Level (running average)
When: April 1, 2024 – June 30, 2024Rule: Stage 2 DBPREnforcement: Formal — state order issued
TIER 3 Resolved
Disinfection byproduct treatment technique failure
When: March 15, 2024 – September 26, 2024Rule: Ground Water RuleEnforcement: Resolving — corrective action underway
TIER 2 Resolved
Exceeded the Maximum Contaminant Level (running average)
When: January 1, 2024 – March 31, 2024Rule: Stage 2 DBPREnforcement: Formal — state order issued
TIER 3 Resolved
Disinfection byproduct treatment technique failure
When: November 22, 2023 – September 26, 2024Rule: Ground Water RuleEnforcement: Resolving — corrective action underway
TIER 2 Resolved
Exceeded the Maximum Contaminant Level (running average)
When: October 1, 2023 – December 31, 2023Rule: Stage 2 DBPREnforcement: Formal — state order issued
TIER 3 Resolved
Disinfection byproduct treatment technique failure
When: September 22, 2023 – September 26, 2024Rule: Ground Water RuleEnforcement: Resolving — corrective action underway
TIER 3 Resolved
Failed to conduct Level 2 Assessment
This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.
When: September 6, 2023 – March 11, 2024Rule: Stage 2 DBPREnforcement: Resolving — corrective action underway
TIER 2 Resolved
Exceeded the Maximum Contaminant Level (running average)
When: July 1, 2023 – September 30, 2023Rule: Stage 2 DBPREnforcement: Formal — state order issued
TIER 3 Resolved
Disinfection byproduct treatment technique failure
When: June 22, 2023 – September 26, 2024Rule: Ground Water RuleEnforcement: Resolving — corrective action underway
TIER 2 Resolved
Exceeded the Maximum Contaminant Level (running average)
When: April 1, 2023 – June 30, 2023Rule: Stage 2 DBPREnforcement: Formal — state order issued
TIER 3 Resolved
Disinfection byproduct treatment technique failure
When: March 16, 2023 – September 26, 2024Rule: Ground Water RuleEnforcement: Resolving — corrective action underway
TIER 3 Resolved
Disinfection byproduct treatment technique failure
When: March 16, 2023 – September 26, 2024Rule: Ground Water RuleEnforcement: Resolving — corrective action underway
TIER 3 Resolved
Failed to conduct Level 2 Assessment
This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.
When: February 15, 2023 – March 11, 2024Rule: Stage 2 DBPREnforcement: Resolving — corrective action underway
TIER 2 Resolved
Exceeded the Maximum Contaminant Level (running average)
When: January 1, 2023 – March 31, 2023Rule: Stage 2 DBPREnforcement: Formal — state order issued
TIER 3 Resolved
Disinfection byproduct treatment technique failure
When: December 22, 2022 – September 26, 2024Rule: Ground Water RuleEnforcement: Resolving — corrective action underway
TIER 2 Resolved
Exceeded the Maximum Contaminant Level (running average)
When: October 1, 2022 – December 31, 2022Rule: Stage 2 DBPREnforcement: Formal — state order issued
TIER 2 Resolved
Exceeded the Maximum Contaminant Level (running average)
When: October 1, 2022 – December 31, 2022Rule: Stage 2 DBPREnforcement: Formal — state order issued
TIER 2 Resolved
Exceeded the Maximum Contaminant Level (running average)
When: July 1, 2022 – September 30, 2022Rule: Stage 2 DBPREnforcement: Formal — state order issued
TIER 3 Resolved
Disinfection byproduct treatment technique failure
When: April 2, 2022 – June 29, 2022Rule: Ground Water RuleEnforcement: Resolving — corrective action underway
TIER 2 Resolved
Exceeded the Maximum Contaminant Level (running average)
When: April 1, 2022 – June 30, 2022Rule: Stage 2 DBPREnforcement: Formal — state order issued
TIER 3 Resolved
Failed to conduct Level 2 Assessment
This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.
When: March 15, 2022 – July 14, 2022Rule: Stage 2 DBPREnforcement: Resolving — corrective action underway
TIER 2 Resolved
Exceeded the Maximum Contaminant Level (running average)
When: January 1, 2022 – March 31, 2022Rule: Stage 2 DBPREnforcement: Formal — state order issued
TIER 3 Resolved
Monitoring / Reporting Violation
This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.
When: December 30, 2021 – July 11, 2022Rule: Ground Water RuleEnforcement: Resolving — corrective action underway
TIER 3 Resolved
Monitoring Violation
This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.
When: July 1, 2021 – July 31, 2021Rule: Total Coliform RuleEnforcement: Resolving — corrective action underway
TIER 3 Resolved
Monitoring Violation
This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.
When: June 1, 2021 – June 30, 2021Rule: Total Coliform RuleEnforcement: Resolving — corrective action underway
TIER 3 Resolved
Monitoring Violation
This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.
When: May 1, 2021 – May 31, 2021Rule: Total Coliform RuleEnforcement: Resolving — corrective action underway
TIER 3 Resolved
Disinfection byproduct treatment technique failure
When: April 18, 2021 – August 13, 2021Rule: Ground Water RuleEnforcement: Resolving — corrective action underway