When: October 11, 2022 – March 30, 2023Rule: Ground Water RuleEnforcement: Resolving — corrective action underway
TIER 3Resolved
Surface water treatment technique failure
When: October 1, 2022 – April 13, 2023Enforcement: Resolving — corrective action underway
TIER 1 — URGENTResolved
Violation related to Nitrate
When: May 1, 2022 – May 31, 2022Rule: Surface Water Treatment RuleEnforcement: Resolving — corrective action underway
TIER 2Unresolved
Violation related to Consumer Confidence Report
When: February 16, 2022Rule: Consumer Confidence RuleEnforcement: Informal — resolved cooperativelyVerify on EPA.gov
TIER 3Resolved
Missed required monitoring deadline
This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.
When: December 1, 2021 – December 31, 2021Rule: Surface Water Treatment RuleEnforcement: Resolving — corrective action underway
TIER 3Resolved
Failed Level 2 Assessment under Revised Total Coliform Rule
This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.
When: November 1, 2021 – November 30, 2021Rule: Stage 1 DBPREnforcement: Resolving — corrective action underway
TIER 3Resolved
Missed required monitoring deadline
This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.
When: November 1, 2021 – November 30, 2021Rule: Surface Water Treatment RuleEnforcement: Resolving — corrective action underway
TIER 3Resolved
Failed to complete routine monitoring
This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.
When: November 1, 2021 – November 30, 2021Rule: Surface Water Treatment RuleEnforcement: Resolving — corrective action underway
TIER 3Resolved
Monitoring Violation
This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.
When: November 1, 2021 – November 30, 2021Rule: Total Coliform RuleEnforcement: Resolving — corrective action underway
TIER 3Resolved
Missed required monitoring deadline
This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.
When: October 1, 2021 – October 31, 2021Rule: Surface Water Treatment RuleEnforcement: Resolving — corrective action underway
TIER 3Resolved
Exceeded the MCL for disinfection byproducts
This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.
When: July 1, 2021 – September 30, 2021Rule: Revised Total Coliform RuleEnforcement: Resolving — corrective action underway
TIER 3Resolved
Exceeded the MCL for disinfection byproducts
This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.
When: July 1, 2021 – September 30, 2021Rule: Revised Total Coliform RuleEnforcement: Resolving — corrective action underway
TIER 3Resolved
Exceeded the MCL for disinfection byproducts
This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.
When: July 1, 2021 – September 30, 2021Rule: Revised Total Coliform RuleEnforcement: Resolving — corrective action underway
TIER 3Resolved
Exceeded the MCL for disinfection byproducts
This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.
When: July 1, 2021 – September 30, 2021Rule: Revised Total Coliform RuleEnforcement: Resolving — corrective action underway
TIER 3Resolved
Exceeded the MCL for disinfection byproducts
This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.
When: July 1, 2021 – September 30, 2021Rule: Revised Total Coliform RuleEnforcement: Resolving — corrective action underway
TIER 3Resolved
Exceeded the MCL for disinfection byproducts
This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.
When: July 1, 2021 – September 30, 2021Rule: Revised Total Coliform RuleEnforcement: Resolving — corrective action underway
TIER 3Resolved
Exceeded the MCL for disinfection byproducts
This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.
When: July 1, 2021 – September 30, 2021Rule: Revised Total Coliform RuleEnforcement: Resolving — corrective action underway
TIER 3Resolved
Exceeded the MCL for disinfection byproducts
This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.
When: July 1, 2021 – September 30, 2021Rule: Revised Total Coliform RuleEnforcement: Resolving — corrective action underway
TIER 3Resolved
Exceeded the MCL for disinfection byproducts
This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.
When: July 1, 2021 – September 30, 2021Rule: Revised Total Coliform RuleEnforcement: Resolving — corrective action underway
TIER 3Resolved
Exceeded the MCL for disinfection byproducts
This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.
When: July 1, 2021 – September 30, 2021Rule: Revised Total Coliform RuleEnforcement: Resolving — corrective action underway
TIER 3Resolved
Exceeded the MCL for disinfection byproducts
This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.
When: July 1, 2021 – September 30, 2021Rule: Revised Total Coliform RuleEnforcement: Resolving — corrective action underway
TIER 3Resolved
Exceeded the MCL for disinfection byproducts
This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.
When: July 1, 2021 – September 30, 2021Rule: Revised Total Coliform RuleEnforcement: Resolving — corrective action underway
TIER 3Resolved
Failed Level 2 Assessment under Revised Total Coliform Rule
This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.
When: July 1, 2021 – September 30, 2021Rule: Stage 1 DBPREnforcement: Resolving — corrective action underway
TIER 3Resolved
Exceeded the MCL for disinfection byproducts
This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.
When: July 1, 2021 – September 30, 2021Rule: Revised Total Coliform RuleEnforcement: Resolving — corrective action underway
TIER 3Resolved
Exceeded the MCL for disinfection byproducts
This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.
When: July 1, 2021 – September 30, 2021Rule: Revised Total Coliform RuleEnforcement: Resolving — corrective action underway
TIER 3Resolved
Exceeded the MCL for disinfection byproducts
This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.
When: July 1, 2021 – September 30, 2021Rule: Revised Total Coliform RuleEnforcement: Resolving — corrective action underway
TIER 3Resolved
Exceeded the MCL for disinfection byproducts
This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.
When: July 1, 2021 – September 30, 2021Rule: Revised Total Coliform RuleEnforcement: Resolving — corrective action underway
TIER 3Resolved
Exceeded the MCL for disinfection byproducts
This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.
When: July 1, 2021 – September 30, 2021Rule: Revised Total Coliform RuleEnforcement: Resolving — corrective action underway
TIER 3Resolved
Exceeded the MCL for disinfection byproducts
This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.
When: July 1, 2021 – September 30, 2021Rule: Revised Total Coliform RuleEnforcement: Resolving — corrective action underway
TIER 3Resolved
Exceeded the MCL for disinfection byproducts
This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.
When: July 1, 2021 – September 30, 2021Rule: Revised Total Coliform RuleEnforcement: Resolving — corrective action underway
TIER 3Resolved
Exceeded the MCL for disinfection byproducts
This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.
When: July 1, 2021 – September 30, 2021Rule: Revised Total Coliform RuleEnforcement: Resolving — corrective action underway
Understanding violation severity
Tier 1Urgent health risk. Utility must notify all customers within 24 hours.Tier 2Important health or treatment issue. Customers notified within 30 days.Tier 3Administrative or monitoring issue. Reported in the annual water quality report.
Source: EPA Safe Drinking Water Information System (SDWIS) · Updated quarterly
Frequently Asked Questions About POINT MARION BORO
Is POINT MARION BORO water safe to drink?
POINT MARION BORO water receives a grade of F (0/100), which is considered failing. 0 contaminant(s) exceed EPA legal limits and 279 violation(s) are on record. Customers may want to consider using a water filter.
What contaminants has POINT MARION BORO detected?
1 contaminants were tested in POINT MARION BORO's water. Notable contaminants include Lead (90th percentile). No contaminants exceed EPA legal limits. 1 exceed EPA health goals (MCLGs).
Does POINT MARION BORO have any EPA violations?
Yes, POINT MARION BORO has 279 EPA violation(s) on record, with the most recent in 2025. Violation types include TT, MR, Other. 24 are health-based violations.
How many people does POINT MARION BORO serve?
POINT MARION BORO serves approximately 1,110 people, Pennsylvania.
What type of water does POINT MARION BORO provide?
POINT MARION BORO sources its water from surface water. Surface water comes from rivers, lakes, or reservoirs and typically requires more extensive treatment. The utility's system ID is PA5260017.
How does POINT MARION BORO compare to other utilities in Pennsylvania?
POINT MARION BORO scores 0/100 with a grade of F (failing). This score suggests significant water quality concerns relative to other utilities. Visit our Pennsylvania state page for a full comparison of water systems.