F0/100

CONEMAUGH TWP MUNI AUTH — Water Quality Report 2026

Serving 7,800 people · Pennsylvania

Water Source
Surface Water
County
System ID
PA4560048
Violations
202

Contaminant Test Results

1 contaminant above EPA health goals
ContaminantDetectedLimit (MCL)Status
Lead (90th percentile)
0.004 mg/L0.015 mg/LAbove Goal

EPA Violation History

85

Violations (last 5yr)

0

Unresolved

0

Health-Related

TIER 3Resolved

Failed to issue ongoing public notification

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: October 1, 2025 – November 4, 2025Rule: Ground Water RuleEnforcement: Resolving — corrective action underway
TIER 3Resolved

Monitoring Violation

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: April 1, 2025 – April 30, 2025Rule: Total Coliform RuleEnforcement: Resolving — corrective action underway
TIER 3Resolved

Failed Level 2 Assessment under Revised Total Coliform Rule

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: January 1, 2025 – March 31, 2025Rule: Stage 2 DBPREnforcement: Resolving — corrective action underway
TIER 3Resolved

Failed to complete routine monitoring

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: January 1, 2025 – January 31, 2025Rule: Surface Water Treatment RuleEnforcement: Resolving — corrective action underway
TIER 3Resolved

Failed Level 2 Assessment under Revised Total Coliform Rule

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: January 1, 2025 – January 31, 2025Rule: Stage 1 DBPREnforcement: Resolving — corrective action underway
TIER 3Resolved

Monitoring Violation

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: January 1, 2025 – January 31, 2025Rule: Total Coliform RuleEnforcement: Resolving — corrective action underway
TIER 3Resolved

Failed Level 2 Assessment under Revised Total Coliform Rule

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: January 1, 2025 – March 31, 2025Rule: Stage 2 DBPREnforcement: Resolving — corrective action underway
TIER 3Resolved

Failed Level 2 Assessment under Revised Total Coliform Rule

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: October 1, 2024 – December 31, 2024Rule: Stage 2 DBPREnforcement: Resolving — corrective action underway
TIER 3Resolved

Failed Level 2 Assessment under Revised Total Coliform Rule

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: October 1, 2024 – December 31, 2024Rule: Stage 2 DBPREnforcement: Resolving — corrective action underway
TIER 3Resolved

Disinfection byproduct treatment technique failure

When: January 11, 2024 – March 29, 2024Rule: Ground Water RuleEnforcement: Resolving — corrective action underway
TIER 3Resolved

Exceeded the MCL for disinfection byproducts

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: January 1, 2024 – December 31, 2024Enforcement: Resolving — corrective action underway
TIER 3Resolved

Exceeded the MCL for disinfection byproducts

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: January 1, 2024 – December 31, 2024Enforcement: Resolving — corrective action underway
TIER 3Resolved

Exceeded the MCL for disinfection byproducts

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: January 1, 2024 – December 31, 2024Enforcement: Resolving — corrective action underway
TIER 3Resolved

Exceeded the MCL for disinfection byproducts

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: January 1, 2024 – December 31, 2024Enforcement: Resolving — corrective action underway
TIER 3Resolved

Exceeded the MCL for disinfection byproducts

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: January 1, 2024 – December 31, 2024Enforcement: Resolving — corrective action underway
TIER 3Resolved

Exceeded the MCL for disinfection byproducts

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: January 1, 2024 – December 31, 2024Rule: Revised Total Coliform RuleEnforcement: Resolving — corrective action underway
TIER 3Resolved

Exceeded the MCL for disinfection byproducts

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: January 1, 2024 – December 31, 2024Rule: Revised Total Coliform RuleEnforcement: Resolving — corrective action underway
TIER 3Resolved

Exceeded the MCL for disinfection byproducts

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: January 1, 2024 – December 31, 2024Enforcement: Resolving — corrective action underway
TIER 3Resolved

Exceeded the MCL for disinfection byproducts

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: January 1, 2024 – December 31, 2024Enforcement: Resolving — corrective action underway
TIER 3Resolved

Exceeded the MCL for disinfection byproducts

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: January 1, 2024 – December 31, 2024Enforcement: Resolving — corrective action underway
TIER 3Resolved

Exceeded the MCL for disinfection byproducts

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: January 1, 2024 – December 31, 2024Rule: Revised Total Coliform RuleEnforcement: Resolving — corrective action underway
TIER 3Resolved

Exceeded the MCL for disinfection byproducts

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: January 1, 2024 – December 31, 2024Rule: Revised Total Coliform RuleEnforcement: Resolving — corrective action underway
TIER 3Resolved

Exceeded the MCL for disinfection byproducts

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: January 1, 2024 – December 31, 2024Rule: Revised Total Coliform RuleEnforcement: Resolving — corrective action underway
TIER 3Resolved

Exceeded the MCL for disinfection byproducts

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: January 1, 2024 – December 31, 2024Rule: Revised Total Coliform RuleEnforcement: Resolving — corrective action underway
TIER 3Resolved

Exceeded the MCL for disinfection byproducts

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: January 1, 2024 – December 31, 2024Rule: Revised Total Coliform RuleEnforcement: Resolving — corrective action underway
TIER 3Resolved

Exceeded the MCL for disinfection byproducts

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: January 1, 2024 – December 31, 2024Rule: Revised Total Coliform RuleEnforcement: Resolving — corrective action underway
TIER 3Resolved

Exceeded the MCL for disinfection byproducts

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: January 1, 2024 – December 31, 2024Rule: Revised Total Coliform RuleEnforcement: Resolving — corrective action underway
TIER 3Resolved

Exceeded the MCL for disinfection byproducts

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: January 1, 2024 – December 31, 2024Rule: Revised Total Coliform RuleEnforcement: Resolving — corrective action underway
TIER 3Resolved

Exceeded the MCL for disinfection byproducts

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: January 1, 2024 – December 31, 2024Rule: Revised Total Coliform RuleEnforcement: Resolving — corrective action underway
TIER 3Resolved

Exceeded the MCL for disinfection byproducts

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: January 1, 2024 – December 31, 2024Rule: Revised Total Coliform RuleEnforcement: Resolving — corrective action underway
TIER 3Resolved

Exceeded the MCL for disinfection byproducts

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: January 1, 2024 – December 31, 2024Rule: Revised Total Coliform RuleEnforcement: Resolving — corrective action underway
TIER 3Resolved

Exceeded the MCL for disinfection byproducts

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: January 1, 2024 – December 31, 2024Rule: Revised Total Coliform RuleEnforcement: Resolving — corrective action underway
TIER 3Resolved

Exceeded the MCL for disinfection byproducts

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: January 1, 2024 – December 31, 2024Rule: Revised Total Coliform RuleEnforcement: Resolving — corrective action underway
TIER 3Resolved

Exceeded the MCL for disinfection byproducts

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: January 1, 2024 – December 31, 2024Rule: Revised Total Coliform RuleEnforcement: Resolving — corrective action underway
TIER 3Resolved

Exceeded the MCL for disinfection byproducts

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: January 1, 2024 – December 31, 2024Rule: Revised Total Coliform RuleEnforcement: Resolving — corrective action underway
TIER 3Resolved

Exceeded the MCL for disinfection byproducts

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: January 1, 2024 – December 31, 2024Rule: Revised Total Coliform RuleEnforcement: Resolving — corrective action underway
TIER 3Resolved

Exceeded the MCL for disinfection byproducts

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: January 1, 2024 – December 31, 2024Rule: Revised Total Coliform RuleEnforcement: Resolving — corrective action underway
TIER 3Resolved

Exceeded the MCL for disinfection byproducts

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: January 1, 2024 – December 31, 2024Rule: Revised Total Coliform RuleEnforcement: Resolving — corrective action underway
TIER 3Resolved

Disinfection byproduct treatment technique failure

When: August 11, 2023 – March 29, 2024Rule: Ground Water RuleEnforcement: Resolving — corrective action underway
TIER 3Resolved

Failed to complete routine monitoring

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: August 1, 2023 – August 31, 2023Rule: Surface Water Treatment RuleEnforcement: Resolving — corrective action underway
TIER 3Resolved

Failed Level 2 Assessment under Revised Total Coliform Rule

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: August 1, 2023 – August 31, 2023Rule: Stage 1 DBPREnforcement: Resolving — corrective action underway
TIER 3Resolved

Monitoring Violation

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: August 1, 2023 – August 31, 2023Rule: Total Coliform RuleEnforcement: Resolving — corrective action underway
TIER 3Resolved

Failed Level 2 Assessment under Revised Total Coliform Rule

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: July 1, 2023 – July 31, 2023Rule: Stage 1 DBPREnforcement: Resolving — corrective action underway
TIER 3Resolved

Failed to complete routine monitoring

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: July 1, 2023 – July 31, 2023Rule: Surface Water Treatment RuleEnforcement: Resolving — corrective action underway
TIER 3Resolved

Surface water treatment technique failure

When: July 1, 2023 – September 18, 2023Enforcement: Resolving — corrective action underway
TIER 3Resolved

Monitoring Violation

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: July 1, 2023 – July 31, 2023Rule: Total Coliform RuleEnforcement: Resolving — corrective action underway
TIER 3Resolved

Failed Level 2 Assessment under Revised Total Coliform Rule

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: April 1, 2023 – April 30, 2023Rule: Stage 1 DBPREnforcement: Resolving — corrective action underway
TIER 3Resolved

Failed to complete routine monitoring

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: April 1, 2023 – April 30, 2023Rule: Surface Water Treatment RuleEnforcement: Resolving — corrective action underway
TIER 3Resolved

Monitoring Violation

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: April 1, 2023 – April 30, 2023Rule: Total Coliform RuleEnforcement: Resolving — corrective action underway
TIER 3Resolved

Exceeded the MCL for disinfection byproducts

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: January 1, 2023 – November 9, 2023Enforcement: Resolving — corrective action underway
TIER 3Resolved

Exceeded the MCL for disinfection byproducts

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: January 1, 2023 – November 9, 2023Enforcement: Resolving — corrective action underway
TIER 3Resolved

Exceeded the MCL for disinfection byproducts

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: January 1, 2023 – November 9, 2023Enforcement: Resolving — corrective action underway
TIER 3Resolved

Exceeded the MCL for disinfection byproducts

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: January 1, 2023 – November 9, 2023Enforcement: Resolving — corrective action underway
TIER 3Resolved

Exceeded the MCL for disinfection byproducts

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: January 1, 2023 – December 31, 2023Enforcement: Resolving — corrective action underway
TIER 3Resolved

Exceeded the MCL for disinfection byproducts

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: January 1, 2023 – December 31, 2023Enforcement: Resolving — corrective action underway
TIER 3Resolved

Exceeded the MCL for disinfection byproducts

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: January 1, 2023 – November 9, 2023Enforcement: Resolving — corrective action underway
TIER 3Resolved

Exceeded the MCL for disinfection byproducts

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: January 1, 2023 – November 9, 2023Enforcement: Resolving — corrective action underway
TIER 3Resolved

Exceeded the MCL for disinfection byproducts

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: January 1, 2023 – November 9, 2023Enforcement: Resolving — corrective action underway
TIER 3Resolved

Exceeded the MCL for disinfection byproducts

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: January 1, 2023 – November 9, 2023Enforcement: Resolving — corrective action underway
TIER 3Resolved

Exceeded the MCL for disinfection byproducts

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: January 1, 2023 – November 9, 2023Enforcement: Resolving — corrective action underway
TIER 3Resolved

Exceeded the MCL for disinfection byproducts

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: January 1, 2023 – December 31, 2023Enforcement: Resolving — corrective action underway
TIER 3Resolved

Exceeded the MCL for disinfection byproducts

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: January 1, 2023 – November 9, 2023Enforcement: Resolving — corrective action underway
TIER 3Resolved

Exceeded the MCL for disinfection byproducts

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: January 1, 2023 – December 31, 2023Enforcement: Resolving — corrective action underway
TIER 3Resolved

Exceeded the MCL for disinfection byproducts

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: January 1, 2023 – November 9, 2023Enforcement: Resolving — corrective action underway
TIER 3Resolved

Exceeded the MCL for disinfection byproducts

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: January 1, 2023 – December 31, 2023Enforcement: Resolving — corrective action underway
TIER 3Resolved

Exceeded the MCL for disinfection byproducts

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: January 1, 2023 – November 9, 2023Enforcement: Resolving — corrective action underway
TIER 3Resolved

Exceeded the MCL for disinfection byproducts

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: January 1, 2023 – November 9, 2023Enforcement: Resolving — corrective action underway
TIER 3Resolved

Exceeded the MCL for disinfection byproducts

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: January 1, 2023 – December 31, 2023Enforcement: Resolving — corrective action underway
TIER 3Resolved

Exceeded the MCL for disinfection byproducts

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: January 1, 2023 – November 9, 2023Enforcement: Resolving — corrective action underway
TIER 3Resolved

Exceeded the MCL for disinfection byproducts

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: January 1, 2023 – December 31, 2023Enforcement: Resolving — corrective action underway
TIER 3Resolved

Exceeded the MCL for disinfection byproducts

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: January 1, 2023 – November 9, 2023Enforcement: Resolving — corrective action underway
TIER 3Resolved

Exceeded the MCL for disinfection byproducts

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: January 1, 2023 – November 9, 2023Enforcement: Resolving — corrective action underway
TIER 3Resolved

Exceeded the MCL for disinfection byproducts

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: January 1, 2023 – March 31, 2023Enforcement: Resolving — corrective action underway
TIER 3Resolved

Exceeded the MCL for disinfection byproducts

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: January 1, 2023 – November 9, 2023Enforcement: Resolving — corrective action underway
TIER 3Resolved

Exceeded the MCL for disinfection byproducts

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: January 1, 2023 – December 31, 2023Enforcement: Resolving — corrective action underway
TIER 3Resolved

Exceeded the MCL for disinfection byproducts

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: January 1, 2023 – December 31, 2023Enforcement: Resolving — corrective action underway
TIER 3Resolved

Failed to issue ongoing public notification

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: October 1, 2022 – November 9, 2023Rule: Ground Water RuleEnforcement: Resolving — corrective action underway
TIER 3Resolved

Violation related to Consumer Confidence Report

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: July 1, 2022 – July 31, 2022Rule: Consumer Confidence RuleEnforcement: Resolving — corrective action underway
TIER 3Resolved

Failed to complete routine monitoring

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: July 1, 2022 – July 31, 2022Rule: Surface Water Treatment RuleEnforcement: Resolving — corrective action underway
TIER 3Resolved

Monitoring Violation

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: July 1, 2022 – July 31, 2022Rule: Total Coliform RuleEnforcement: Resolving — corrective action underway
TIER 3Resolved

Failed to complete routine monitoring

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: April 1, 2022 – April 30, 2022Rule: Surface Water Treatment RuleEnforcement: Resolving — corrective action underway
TIER 3Resolved

Failed Level 2 Assessment under Revised Total Coliform Rule

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: April 1, 2022 – April 30, 2022Rule: Stage 1 DBPREnforcement: Resolving — corrective action underway
TIER 3Resolved

Monitoring Violation

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: April 1, 2022 – April 30, 2022Rule: Total Coliform RuleEnforcement: Resolving — corrective action underway
TIER 3Resolved

Exceeded the MCL for disinfection byproducts

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: January 1, 2022 – December 31, 2022Enforcement: Resolving — corrective action underway
TIER 3Resolved

Exceeded the MCL for disinfection byproducts

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: January 1, 2022 – December 31, 2022Enforcement: Resolving — corrective action underway

Understanding violation severity

Tier 1Urgent health risk. Utility must notify all customers within 24 hours.Tier 2Important health or treatment issue. Customers notified within 30 days.Tier 3Administrative or monitoring issue. Reported in the annual water quality report.

Source: EPA Safe Drinking Water Information System (SDWIS) · Updated quarterly

Frequently Asked Questions About CONEMAUGH TWP MUNI AUTH

Is CONEMAUGH TWP MUNI AUTH water safe to drink?

CONEMAUGH TWP MUNI AUTH water receives a grade of F (0/100), which is considered failing. 0 contaminant(s) exceed EPA legal limits and 202 violation(s) are on record. Customers may want to consider using a water filter.

What contaminants has CONEMAUGH TWP MUNI AUTH detected?

31 contaminants were tested in CONEMAUGH TWP MUNI AUTH's water. Notable contaminants include Lead (90th percentile). No contaminants exceed EPA legal limits. 1 exceed EPA health goals (MCLGs).

Does CONEMAUGH TWP MUNI AUTH have any EPA violations?

Yes, CONEMAUGH TWP MUNI AUTH has 202 EPA violation(s) on record, with the most recent in 2025. Violation types include MR, MON, Other. 2 are health-based violations.

How many people does CONEMAUGH TWP MUNI AUTH serve?

CONEMAUGH TWP MUNI AUTH serves approximately 7,800 people, Pennsylvania.

What type of water does CONEMAUGH TWP MUNI AUTH provide?

CONEMAUGH TWP MUNI AUTH sources its water from surface water. Surface water comes from rivers, lakes, or reservoirs and typically requires more extensive treatment. The utility's system ID is PA4560048.

How does CONEMAUGH TWP MUNI AUTH compare to other utilities in Pennsylvania?

CONEMAUGH TWP MUNI AUTH scores 0/100 with a grade of F (failing). This score suggests significant water quality concerns relative to other utilities. Visit our Pennsylvania state page for a full comparison of water systems.