WARM SPRINGS WATER TREATMENT PLANT — Water Quality Report 2026

Serving 3,800 people · Oregon

Water Source
Surface Water
County
System ID
104101247
Violations
364

Contaminant Test Results

1 contaminant above EPA health goals
ContaminantDetectedLimit (MCL)Status
Lead (90th percentile)
0.014 mg/L0.015 mg/LAbove Goal

EPA Violation History

157

Violations (last 5yr)

67

Unresolved

9

Health-Related

TIER 3Unresolved

Missed required monitoring deadline

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: September 1, 2025 – September 30, 2025Rule: Surface Water Treatment RuleVerify on EPA.gov
TIER 3Unresolved

Failed to complete routine monitoring

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: September 1, 2025 – September 30, 2025Rule: Surface Water Treatment RuleVerify on EPA.gov
TIER 3Unresolved

Disinfection byproduct treatment technique failure

When: August 25, 2025Rule: Ground Water RuleVerify on EPA.gov
TIER 3Unresolved

Disinfection byproduct treatment technique failure

When: August 25, 2025Rule: Ground Water RuleVerify on EPA.gov
TIER 3Unresolved

Disinfection byproduct treatment technique failure

When: August 25, 2025Rule: Ground Water RuleVerify on EPA.gov
TIER 3Unresolved

Disinfection byproduct treatment technique failure

When: August 25, 2025Rule: Ground Water RuleVerify on EPA.gov
TIER 3Unresolved

Disinfection byproduct treatment technique failure

When: August 25, 2025Rule: Ground Water RuleVerify on EPA.gov
TIER 3Unresolved

Disinfection byproduct treatment technique failure

When: August 25, 2025Rule: Ground Water RuleVerify on EPA.gov
TIER 3Unresolved

Disinfection byproduct treatment technique failure

When: August 25, 2025Rule: Ground Water RuleVerify on EPA.gov
TIER 3Unresolved

Disinfection byproduct treatment technique failure

When: August 25, 2025Rule: Ground Water RuleVerify on EPA.gov
TIER 3Unresolved

Failed to complete routine monitoring

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: August 1, 2025 – August 31, 2025Rule: Surface Water Treatment RuleVerify on EPA.gov
TIER 3Unresolved

Missed required monitoring deadline

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: August 1, 2025 – August 31, 2025Rule: Surface Water Treatment RuleVerify on EPA.gov
TIER 2Unresolved

Violation related to Lead and Copper Rule

When: July 8, 2025Rule: Surface Water Treatment RuleVerify on EPA.gov
TIER 2Unresolved

Violation related to Lead and Copper Rule

When: July 8, 2025Rule: Surface Water Treatment RuleVerify on EPA.gov
TIER 2Unresolved

Violation related to Lead and Copper Rule

When: July 8, 2025Rule: Surface Water Treatment RuleVerify on EPA.gov
TIER 2Unresolved

Violation related to Lead and Copper Rule

When: July 8, 2025Rule: Surface Water Treatment RuleVerify on EPA.gov
TIER 2Unresolved

Violation related to Lead and Copper Rule

When: July 8, 2025Rule: Surface Water Treatment RuleVerify on EPA.gov
TIER 2Unresolved

Violation related to Lead and Copper Rule

When: July 8, 2025Rule: Surface Water Treatment RuleVerify on EPA.gov
TIER 2Unresolved

Violation related to Lead and Copper Rule

When: July 8, 2025Rule: Surface Water Treatment RuleVerify on EPA.gov
TIER 2Unresolved

Violation related to Lead and Copper Rule

When: July 8, 2025Rule: Surface Water Treatment RuleVerify on EPA.gov
TIER 3Unresolved

Failed to complete routine monitoring

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: July 1, 2025 – July 31, 2025Rule: Surface Water Treatment RuleVerify on EPA.gov
TIER 3Unresolved

Missed required monitoring deadline

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: July 1, 2025 – July 31, 2025Rule: Surface Water Treatment RuleVerify on EPA.gov
TIER 3Unresolved

Failed Level 2 Assessment under Revised Total Coliform Rule

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: July 1, 2025 – September 30, 2025Rule: Stage 1 DBPRVerify on EPA.gov
TIER 3Unresolved

Failed Level 2 Assessment under Revised Total Coliform Rule

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: July 1, 2025 – September 30, 2025Rule: Stage 1 DBPRVerify on EPA.gov
TIER 3Resolved

Failed Level 2 Assessment under Revised Total Coliform Rule

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: June 1, 2025 – June 30, 2025Rule: Stage 1 DBPREnforcement: Resolving — corrective action underway
TIER 3Unresolved

Missed required monitoring deadline

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: June 1, 2025 – June 30, 2025Rule: Surface Water Treatment RuleVerify on EPA.gov
TIER 3Unresolved

Failed to complete routine monitoring

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: June 1, 2025 – June 30, 2025Rule: Surface Water Treatment RuleVerify on EPA.gov
TIER 3Resolved

Monitoring Violation

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: June 1, 2025 – June 30, 2025Rule: Total Coliform RuleEnforcement: Resolving — corrective action underway
TIER 3Resolved

Failed to complete routine monitoring

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: May 1, 2025 – May 31, 2025Rule: Surface Water Treatment RuleEnforcement: Resolving — corrective action underway
TIER 3Resolved

Missed required monitoring deadline

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: May 1, 2025 – May 31, 2025Rule: Surface Water Treatment RuleEnforcement: Resolving — corrective action underway
TIER 3Resolved

Failed Level 2 Assessment under Revised Total Coliform Rule

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: January 1, 2025 – March 31, 2025Rule: Stage 1 DBPREnforcement: Resolving — corrective action underway
TIER 3Unresolved

Disinfection byproduct treatment technique failure

When: December 13, 2024Rule: Ground Water RuleVerify on EPA.gov
TIER 3Unresolved

Reporting violation

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: October 17, 2024Rule: Ground Water RuleVerify on EPA.gov
TIER 2Unresolved

Treatment technique violation

When: October 17, 2024Rule: Ground Water RuleVerify on EPA.gov
TIER 3Resolved

Failed Level 2 Assessment under Revised Total Coliform Rule

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: October 1, 2024 – December 31, 2024Rule: Stage 1 DBPREnforcement: Resolving — corrective action underway
TIER 3Resolved

Failed Level 2 Assessment under Revised Total Coliform Rule

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: October 1, 2024 – December 31, 2024Rule: Stage 1 DBPREnforcement: Resolving — corrective action underway
TIER 3Unresolved

Failed to issue ongoing public notification

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: October 1, 2024Rule: Ground Water RuleVerify on EPA.gov
TIER 3Resolved

Failed Level 2 Assessment under Revised Total Coliform Rule

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: July 1, 2024 – September 30, 2024Rule: Stage 1 DBPREnforcement: Resolving — corrective action underway
TIER 3Resolved

Failed Level 2 Assessment under Revised Total Coliform Rule

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: April 1, 2024 – June 30, 2024Rule: Stage 1 DBPREnforcement: Resolving — corrective action underway
TIER 3Resolved

Failed Level 2 Assessment under Revised Total Coliform Rule

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: April 1, 2024 – June 30, 2024Rule: Stage 1 DBPREnforcement: Resolving — corrective action underway
TIER 3Resolved

Exceeded the MCL for disinfection byproducts

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: January 1, 2024 – December 31, 2024Enforcement: Resolving — corrective action underway
TIER 3Unresolved

Exceeded the MCL for disinfection byproducts

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: January 1, 2024 – December 31, 2024Rule: Revised Total Coliform RuleVerify on EPA.gov
TIER 3Unresolved

Exceeded the MCL for disinfection byproducts

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: January 1, 2024 – December 31, 2024Verify on EPA.gov
TIER 3Unresolved

Exceeded the MCL for disinfection byproducts

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: January 1, 2024 – December 31, 2024Verify on EPA.gov
TIER 3Unresolved

Exceeded the MCL for disinfection byproducts

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: January 1, 2024 – December 31, 2024Verify on EPA.gov
TIER 3Unresolved

Failed Level 2 Assessment under Revised Total Coliform Rule

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: January 1, 2024 – December 31, 2024Rule: Stage 2 DBPRVerify on EPA.gov
TIER 3Unresolved

Exceeded the MCL for disinfection byproducts

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: January 1, 2024 – December 31, 2024Verify on EPA.gov
TIER 3Unresolved

Exceeded the MCL for disinfection byproducts

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: January 1, 2024 – December 31, 2024Verify on EPA.gov
TIER 3Unresolved

Exceeded the MCL for disinfection byproducts

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: January 1, 2024 – December 31, 2024Verify on EPA.gov
TIER 3Unresolved

Exceeded the MCL for disinfection byproducts

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: January 1, 2024 – December 31, 2024Verify on EPA.gov
TIER 3Unresolved

Exceeded the MCL for disinfection byproducts

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: January 1, 2024 – December 31, 2024Rule: Revised Total Coliform RuleVerify on EPA.gov
TIER 3Unresolved

Exceeded the MCL for disinfection byproducts

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: January 1, 2024 – December 31, 2024Verify on EPA.gov
TIER 3Unresolved

Exceeded the MCL for disinfection byproducts

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: January 1, 2024 – December 31, 2024Verify on EPA.gov
TIER 3Unresolved

Exceeded the MCL for disinfection byproducts

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: January 1, 2024 – December 31, 2024Verify on EPA.gov
TIER 3Unresolved

Exceeded the MCL for disinfection byproducts

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: January 1, 2024 – December 31, 2024Rule: Revised Total Coliform RuleVerify on EPA.gov
TIER 3Resolved

Failed Level 2 Assessment under Revised Total Coliform Rule

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: January 1, 2024 – March 31, 2024Rule: Stage 1 DBPREnforcement: Resolving — corrective action underway
TIER 3Unresolved

Exceeded the MCL for disinfection byproducts

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: January 1, 2024 – December 31, 2024Rule: Revised Total Coliform RuleVerify on EPA.gov
TIER 3Unresolved

Exceeded the MCL for disinfection byproducts

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: January 1, 2024 – December 31, 2024Verify on EPA.gov
TIER 3Unresolved

Exceeded the MCL for disinfection byproducts

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: January 1, 2024 – December 31, 2024Rule: Revised Total Coliform RuleVerify on EPA.gov
TIER 3Unresolved

Exceeded the MCL for disinfection byproducts

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: January 1, 2024 – December 31, 2024Rule: Revised Total Coliform RuleVerify on EPA.gov
TIER 3Unresolved

Exceeded the MCL for disinfection byproducts

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: January 1, 2024 – December 31, 2024Rule: Revised Total Coliform RuleVerify on EPA.gov
TIER 3Unresolved

Exceeded the MCL for disinfection byproducts

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: January 1, 2024 – December 31, 2024Rule: Revised Total Coliform RuleVerify on EPA.gov
TIER 3Unresolved

Failed Level 2 Assessment under Revised Total Coliform Rule

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: January 1, 2024 – December 31, 2024Rule: Stage 2 DBPRVerify on EPA.gov
TIER 3Unresolved

Exceeded the MCL for disinfection byproducts

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: January 1, 2024 – December 31, 2024Rule: Revised Total Coliform RuleVerify on EPA.gov
TIER 3Unresolved

Exceeded the MCL for disinfection byproducts

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: January 1, 2024 – December 31, 2024Rule: Revised Total Coliform RuleVerify on EPA.gov
TIER 3Unresolved

Exceeded the MCL for disinfection byproducts

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: January 1, 2024 – December 31, 2024Rule: Revised Total Coliform RuleVerify on EPA.gov
TIER 3Unresolved

Exceeded the MCL for disinfection byproducts

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: January 1, 2024 – December 31, 2024Rule: Revised Total Coliform RuleVerify on EPA.gov
TIER 3Unresolved

Exceeded the MCL for disinfection byproducts

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: January 1, 2024 – December 31, 2024Verify on EPA.gov
TIER 3Unresolved

Exceeded the MCL for disinfection byproducts

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: January 1, 2024 – December 31, 2024Rule: Revised Total Coliform RuleVerify on EPA.gov
TIER 3Unresolved

Exceeded the MCL for disinfection byproducts

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: January 1, 2024 – December 31, 2024Rule: Revised Total Coliform RuleVerify on EPA.gov
TIER 3Unresolved

Exceeded the MCL for disinfection byproducts

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: January 1, 2024 – December 31, 2024Rule: Revised Total Coliform RuleVerify on EPA.gov
TIER 3Unresolved

Exceeded the MCL for disinfection byproducts

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: January 1, 2024 – December 31, 2024Rule: Revised Total Coliform RuleVerify on EPA.gov
TIER 3Unresolved

Exceeded the MCL for disinfection byproducts

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: January 1, 2024 – December 31, 2024Rule: Revised Total Coliform RuleVerify on EPA.gov
TIER 3Unresolved

Exceeded the MCL for disinfection byproducts

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: January 1, 2024 – December 31, 2024Rule: Revised Total Coliform RuleVerify on EPA.gov
TIER 3Unresolved

Exceeded the MCL for disinfection byproducts

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: January 1, 2024 – December 31, 2024Rule: Revised Total Coliform RuleVerify on EPA.gov
TIER 3Unresolved

Exceeded the MCL for disinfection byproducts

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: January 1, 2024 – December 31, 2024Rule: Revised Total Coliform RuleVerify on EPA.gov
TIER 3Unresolved

Exceeded the MCL for disinfection byproducts

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: January 1, 2024 – December 31, 2024Rule: Revised Total Coliform RuleVerify on EPA.gov
TIER 3Resolved

Missed required monitoring deadline

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: November 1, 2023 – November 30, 2023Rule: Surface Water Treatment RuleEnforcement: Resolving — corrective action underway
TIER 3Resolved

Failed to complete routine monitoring

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: November 1, 2023 – November 30, 2023Rule: Surface Water Treatment RuleEnforcement: Resolving — corrective action underway
TIER 3Resolved

Failed Level 2 Assessment under Revised Total Coliform Rule

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: October 1, 2023 – December 31, 2023Rule: Stage 1 DBPREnforcement: Resolving — corrective action underway
TIER 3Resolved

Monitoring violation

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: August 1, 2023 – September 18, 2023Rule: Total Coliform RuleEnforcement: Resolving — corrective action underway
TIER 3Resolved

Surface water treatment technique failure

When: July 1, 2023 – July 7, 2023Enforcement: Resolving — corrective action underway
TIER 3Resolved

Failed Level 2 Assessment under Revised Total Coliform Rule

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: July 1, 2023 – September 18, 2023Rule: Stage 1 DBPREnforcement: Resolving — corrective action underway
TIER 3Resolved

Failed Level 2 Assessment under Revised Total Coliform Rule

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: April 1, 2023 – June 30, 2023Rule: Stage 1 DBPREnforcement: Resolving — corrective action underway
TIER 3Resolved

Exceeded the MCL for disinfection byproducts

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: January 1, 2023 – December 31, 2023Enforcement: Resolving — corrective action underway
TIER 3Resolved

Exceeded the MCL for disinfection byproducts

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: January 1, 2023 – December 31, 2023Enforcement: Resolving — corrective action underway
TIER 3Resolved

Exceeded the MCL for disinfection byproducts

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: January 1, 2023 – December 31, 2023Enforcement: Resolving — corrective action underway
TIER 3Resolved

Exceeded the MCL for disinfection byproducts

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: January 1, 2023 – December 31, 2023Enforcement: Resolving — corrective action underway
TIER 3Resolved

Exceeded the MCL for disinfection byproducts

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: January 1, 2023 – December 31, 2023Enforcement: Resolving — corrective action underway
TIER 3Resolved

Exceeded the MCL for disinfection byproducts

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: January 1, 2023 – December 31, 2023Enforcement: Resolving — corrective action underway
TIER 3Resolved

Exceeded the MCL for disinfection byproducts

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: January 1, 2023 – December 31, 2023Enforcement: Resolving — corrective action underway
TIER 3Resolved

Exceeded the MCL for disinfection byproducts

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: January 1, 2023 – December 31, 2023Rule: Revised Total Coliform RuleEnforcement: Resolving — corrective action underway
TIER 3Resolved

Exceeded the MCL for disinfection byproducts

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: January 1, 2023 – December 31, 2023Rule: Revised Total Coliform RuleEnforcement: Resolving — corrective action underway
TIER 3Resolved

Exceeded the MCL for disinfection byproducts

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: January 1, 2023 – December 31, 2023Enforcement: Resolving — corrective action underway
TIER 3Resolved

Exceeded the MCL for disinfection byproducts

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: January 1, 2023 – December 31, 2023Enforcement: Resolving — corrective action underway
TIER 3Resolved

Exceeded the MCL for disinfection byproducts

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: January 1, 2023 – December 31, 2023Enforcement: Resolving — corrective action underway
TIER 3Resolved

Exceeded the MCL for disinfection byproducts

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: January 1, 2023 – December 31, 2023Enforcement: Resolving — corrective action underway
TIER 3Resolved

Exceeded the MCL for disinfection byproducts

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: January 1, 2023 – December 31, 2023Rule: Revised Total Coliform RuleEnforcement: Resolving — corrective action underway
TIER 3Unresolved

Failed Level 2 Assessment under Revised Total Coliform Rule

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: January 1, 2023 – December 31, 2023Rule: Stage 2 DBPRVerify on EPA.gov
TIER 3Resolved

Exceeded the MCL for disinfection byproducts

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: January 1, 2023 – December 31, 2023Enforcement: Resolving — corrective action underway
TIER 3Resolved

Exceeded the MCL for disinfection byproducts

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: January 1, 2023 – December 31, 2023Rule: Revised Total Coliform RuleEnforcement: Resolving — corrective action underway
TIER 3Resolved

Exceeded the MCL for disinfection byproducts

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: January 1, 2023 – December 31, 2023Rule: Revised Total Coliform RuleEnforcement: Resolving — corrective action underway
TIER 3Resolved

Exceeded the MCL for disinfection byproducts

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: January 1, 2023 – December 31, 2023Rule: Revised Total Coliform RuleEnforcement: Resolving — corrective action underway
TIER 3Resolved

Exceeded the MCL for disinfection byproducts

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: January 1, 2023 – December 31, 2023Rule: Revised Total Coliform RuleEnforcement: Resolving — corrective action underway
TIER 3Resolved

Exceeded the MCL for disinfection byproducts

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: January 1, 2023 – December 31, 2023Rule: Revised Total Coliform RuleEnforcement: Resolving — corrective action underway
TIER 3Resolved

Exceeded the MCL for disinfection byproducts

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: January 1, 2023 – December 31, 2023Rule: Revised Total Coliform RuleEnforcement: Resolving — corrective action underway
TIER 3Resolved

Exceeded the MCL for disinfection byproducts

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: January 1, 2023 – December 31, 2023Rule: Revised Total Coliform RuleEnforcement: Resolving — corrective action underway
TIER 3Resolved

Exceeded the MCL for disinfection byproducts

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: January 1, 2023 – December 31, 2023Rule: Revised Total Coliform RuleEnforcement: Resolving — corrective action underway
TIER 3Resolved

Exceeded the MCL for disinfection byproducts

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: January 1, 2023 – December 31, 2023Rule: Revised Total Coliform RuleEnforcement: Resolving — corrective action underway
TIER 3Resolved

Exceeded the MCL for disinfection byproducts

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: January 1, 2023 – December 31, 2023Rule: Revised Total Coliform RuleEnforcement: Resolving — corrective action underway
TIER 3Resolved

Exceeded the MCL for disinfection byproducts

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: January 1, 2023 – December 31, 2023Rule: Revised Total Coliform RuleEnforcement: Resolving — corrective action underway
TIER 3Resolved

Exceeded the MCL for disinfection byproducts

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: January 1, 2023 – December 31, 2023Rule: Revised Total Coliform RuleEnforcement: Resolving — corrective action underway
TIER 3Resolved

Exceeded the MCL for disinfection byproducts

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: January 1, 2023 – December 31, 2023Rule: Revised Total Coliform RuleEnforcement: Resolving — corrective action underway
TIER 3Resolved

Exceeded the MCL for disinfection byproducts

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: January 1, 2023 – December 31, 2023Rule: Revised Total Coliform RuleEnforcement: Resolving — corrective action underway
TIER 3Resolved

Exceeded the MCL for disinfection byproducts

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: January 1, 2023 – December 31, 2023Rule: Revised Total Coliform RuleEnforcement: Resolving — corrective action underway
TIER 3Resolved

Exceeded the MCL for disinfection byproducts

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: January 1, 2023 – December 31, 2023Enforcement: Resolving — corrective action underway
TIER 3Resolved

Exceeded the MCL for disinfection byproducts

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: January 1, 2023 – December 31, 2023Rule: Revised Total Coliform RuleEnforcement: Resolving — corrective action underway
TIER 3Resolved

Exceeded the MCL for disinfection byproducts

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: January 1, 2023 – December 31, 2023Rule: Revised Total Coliform RuleEnforcement: Resolving — corrective action underway
TIER 3Resolved

Exceeded the MCL for disinfection byproducts

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: January 1, 2023 – December 31, 2023Rule: Revised Total Coliform RuleEnforcement: Resolving — corrective action underway
TIER 3Resolved

Failed Level 2 Assessment under Revised Total Coliform Rule

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: January 1, 2023 – March 31, 2023Rule: Stage 1 DBPREnforcement: Resolving — corrective action underway
TIER 3Unresolved

Failed Level 2 Assessment under Revised Total Coliform Rule

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: January 1, 2023 – December 31, 2023Rule: Stage 2 DBPRVerify on EPA.gov
TIER 3Resolved

Surface water treatment technique failure

When: October 2, 2022 – November 2, 2022Enforcement: Resolving — corrective action underway
TIER 3Resolved

Surface water treatment technique failure

When: July 1, 2022 – October 24, 2022Enforcement: Resolving — corrective action underway
TIER 3Resolved

Exceeded the MCL for disinfection byproducts

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: January 1, 2022 – December 31, 2022Rule: Revised Total Coliform RuleEnforcement: Resolving — corrective action underway
TIER 3Resolved

Exceeded the MCL for disinfection byproducts

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: January 1, 2022 – December 31, 2022Rule: Revised Total Coliform RuleEnforcement: Resolving — corrective action underway
TIER 3Resolved

Exceeded the MCL for disinfection byproducts

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: January 1, 2022 – December 31, 2022Enforcement: Resolving — corrective action underway
TIER 3Resolved

Exceeded the MCL for disinfection byproducts

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: January 1, 2022 – December 31, 2022Enforcement: Resolving — corrective action underway
TIER 3Resolved

Exceeded the MCL for disinfection byproducts

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: January 1, 2022 – December 31, 2022Enforcement: Resolving — corrective action underway
TIER 3Resolved

Exceeded the MCL for disinfection byproducts

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: January 1, 2022 – December 31, 2022Enforcement: Resolving — corrective action underway
TIER 3Resolved

Exceeded the MCL for disinfection byproducts

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: January 1, 2022 – December 31, 2022Enforcement: Resolving — corrective action underway
TIER 3Resolved

Exceeded the MCL for disinfection byproducts

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: January 1, 2022 – December 31, 2022Enforcement: Resolving — corrective action underway
TIER 3Resolved

Exceeded the MCL for disinfection byproducts

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: January 1, 2022 – December 31, 2022Enforcement: Resolving — corrective action underway
TIER 3Resolved

Exceeded the MCL for disinfection byproducts

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: January 1, 2022 – December 31, 2022Enforcement: Resolving — corrective action underway
TIER 3Resolved

Exceeded the MCL for disinfection byproducts

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: January 1, 2022 – December 31, 2022Rule: Revised Total Coliform RuleEnforcement: Resolving — corrective action underway
TIER 3Resolved

Exceeded the MCL for disinfection byproducts

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: January 1, 2022 – December 31, 2022Enforcement: Resolving — corrective action underway
TIER 3Resolved

Exceeded the MCL for disinfection byproducts

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: January 1, 2022 – December 31, 2022Enforcement: Resolving — corrective action underway
TIER 3Resolved

Exceeded the MCL for disinfection byproducts

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: January 1, 2022 – December 31, 2022Enforcement: Resolving — corrective action underway
TIER 3Resolved

Exceeded the MCL for disinfection byproducts

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: January 1, 2022 – December 31, 2022Rule: Revised Total Coliform RuleEnforcement: Resolving — corrective action underway
TIER 3Resolved

Exceeded the MCL for disinfection byproducts

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: January 1, 2022 – December 31, 2022Rule: Revised Total Coliform RuleEnforcement: Resolving — corrective action underway
TIER 3Resolved

Exceeded the MCL for disinfection byproducts

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: January 1, 2022 – December 31, 2022Rule: Revised Total Coliform RuleEnforcement: Resolving — corrective action underway
TIER 3Resolved

Exceeded the MCL for disinfection byproducts

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: January 1, 2022 – December 31, 2022Rule: Revised Total Coliform RuleEnforcement: Resolving — corrective action underway
TIER 3Resolved

Exceeded the MCL for disinfection byproducts

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: January 1, 2022 – December 31, 2022Rule: Revised Total Coliform RuleEnforcement: Resolving — corrective action underway
TIER 3Resolved

Exceeded the MCL for disinfection byproducts

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: January 1, 2022 – December 31, 2022Rule: Revised Total Coliform RuleEnforcement: Resolving — corrective action underway
TIER 3Resolved

Exceeded the MCL for disinfection byproducts

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: January 1, 2022 – December 31, 2022Rule: Revised Total Coliform RuleEnforcement: Resolving — corrective action underway
TIER 3Resolved

Exceeded the MCL for disinfection byproducts

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: January 1, 2022 – December 31, 2022Rule: Revised Total Coliform RuleEnforcement: Resolving — corrective action underway
TIER 3Resolved

Exceeded the MCL for disinfection byproducts

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: January 1, 2022 – December 31, 2022Rule: Revised Total Coliform RuleEnforcement: Resolving — corrective action underway
TIER 3Resolved

Exceeded the MCL for disinfection byproducts

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: January 1, 2022 – December 31, 2022Rule: Revised Total Coliform RuleEnforcement: Resolving — corrective action underway
TIER 3Resolved

Exceeded the MCL for disinfection byproducts

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: January 1, 2022 – December 31, 2022Enforcement: Resolving — corrective action underway
TIER 3Resolved

Exceeded the MCL for disinfection byproducts

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: January 1, 2022 – December 31, 2022Rule: Revised Total Coliform RuleEnforcement: Resolving — corrective action underway
TIER 3Resolved

Exceeded the MCL for disinfection byproducts

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: January 1, 2022 – December 31, 2022Rule: Revised Total Coliform RuleEnforcement: Resolving — corrective action underway
TIER 3Resolved

Exceeded the MCL for disinfection byproducts

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: January 1, 2022 – December 31, 2022Rule: Revised Total Coliform RuleEnforcement: Resolving — corrective action underway
TIER 3Resolved

Exceeded the MCL for disinfection byproducts

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: January 1, 2022 – December 31, 2022Rule: Revised Total Coliform RuleEnforcement: Resolving — corrective action underway
TIER 3Resolved

Exceeded the MCL for disinfection byproducts

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: January 1, 2022 – December 31, 2022Rule: Revised Total Coliform RuleEnforcement: Resolving — corrective action underway
TIER 3Resolved

Exceeded the MCL for disinfection byproducts

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: January 1, 2022 – December 31, 2022Enforcement: Resolving — corrective action underway
TIER 3Resolved

Exceeded the MCL for disinfection byproducts

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: January 1, 2022 – December 31, 2022Rule: Revised Total Coliform RuleEnforcement: Resolving — corrective action underway
TIER 3Resolved

Exceeded the MCL for disinfection byproducts

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: January 1, 2022 – December 31, 2022Rule: Revised Total Coliform RuleEnforcement: Resolving — corrective action underway
TIER 3Resolved

Exceeded the MCL for disinfection byproducts

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: January 1, 2022 – December 31, 2022Rule: Revised Total Coliform RuleEnforcement: Resolving — corrective action underway

Understanding violation severity

Tier 1Urgent health risk. Utility must notify all customers within 24 hours.Tier 2Important health or treatment issue. Customers notified within 30 days.Tier 3Administrative or monitoring issue. Reported in the annual water quality report.

Source: EPA Safe Drinking Water Information System (SDWIS) · Updated quarterly

Frequently Asked Questions About WARM SPRINGS WATER TREATMENT PLANT

Is WARM SPRINGS WATER TREATMENT PLANT water safe to drink?

WARM SPRINGS WATER TREATMENT PLANT water receives a grade of F (0/100), which is considered failing. 0 contaminant(s) exceed EPA legal limits and 364 violation(s) are on record. Customers may want to consider using a water filter.

What contaminants has WARM SPRINGS WATER TREATMENT PLANT detected?

31 contaminants were tested in WARM SPRINGS WATER TREATMENT PLANT's water. Notable contaminants include Lead (90th percentile). No contaminants exceed EPA legal limits. 1 exceed EPA health goals (MCLGs).

Does WARM SPRINGS WATER TREATMENT PLANT have any EPA violations?

Yes, WARM SPRINGS WATER TREATMENT PLANT has 364 EPA violation(s) on record, with the most recent in 2025. Violation types include MR, Other, TT. 40 are health-based violations.

How many people does WARM SPRINGS WATER TREATMENT PLANT serve?

WARM SPRINGS WATER TREATMENT PLANT serves approximately 3,800 people, Oregon. The system provides water to 1 community: Warm Springs.

What type of water does WARM SPRINGS WATER TREATMENT PLANT provide?

WARM SPRINGS WATER TREATMENT PLANT sources its water from surface water. Surface water comes from rivers, lakes, or reservoirs and typically requires more extensive treatment. The utility's system ID is 104101247.

How does WARM SPRINGS WATER TREATMENT PLANT compare to other utilities in Oregon?

WARM SPRINGS WATER TREATMENT PLANT scores 0/100 with a grade of F (failing). This score suggests significant water quality concerns relative to other utilities. Visit our Oregon state page for a full comparison of water systems.

Cities Served