Violations
144

Contaminant Test Results

EPA Violation History

63

Violations (last 5yr)

0

Unresolved

0

Health-Related

TIER 3Resolved

Missed required monitoring deadline

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: February 1, 2025 – February 28, 2025Rule: Surface Water Treatment RuleEnforcement: Resolving — corrective action underway
TIER 3Resolved

Missed required monitoring deadline

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: February 1, 2025 – February 28, 2025Rule: Surface Water Treatment RuleEnforcement: Resolving — corrective action underway
TIER 3Resolved

Failed to complete routine monitoring

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: February 1, 2025 – February 28, 2025Rule: Surface Water Treatment RuleEnforcement: Resolving — corrective action underway
TIER 3Resolved

Failed to complete routine monitoring

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: February 1, 2025 – February 28, 2025Rule: Surface Water Treatment RuleEnforcement: Resolving — corrective action underway
TIER 3Resolved

Failed to complete routine monitoring

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: February 1, 2025 – February 28, 2025Rule: Surface Water Treatment RuleEnforcement: Resolving — corrective action underway
TIER 3Resolved

Failed to complete routine monitoring

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: February 1, 2025 – February 28, 2025Rule: Surface Water Treatment RuleEnforcement: Resolving — corrective action underway
TIER 3Resolved

Monitoring Violation

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: February 1, 2025 – February 28, 2025Rule: Total Coliform RuleEnforcement: Resolving — corrective action underway
TIER 3Resolved

Consumer confidence report — inadequate or unavailable

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: January 1, 2025 – April 10, 2025Rule: Ground Water RuleEnforcement: Resolving — corrective action underway
TIER 3Resolved

Consumer confidence report — inadequate or unavailable

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: January 1, 2025 – April 10, 2025Rule: Ground Water RuleEnforcement: Resolving — corrective action underway
TIER 3Resolved

Monitoring Violation

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: December 1, 2024 – December 31, 2024Rule: Total Coliform RuleEnforcement: Resolving — corrective action underway
TIER 3Resolved

Monitoring Violation

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: May 1, 2024 – May 31, 2024Rule: Total Coliform RuleEnforcement: Resolving — corrective action underway
TIER 3Resolved

Exceeded the MCL for disinfection byproducts

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: January 1, 2023 – December 31, 2023Enforcement: Resolving — corrective action underway
TIER 3Resolved

Exceeded the MCL for disinfection byproducts

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: January 1, 2023 – December 31, 2023Enforcement: Resolving — corrective action underway
TIER 3Resolved

Exceeded the MCL for disinfection byproducts

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: January 1, 2023 – December 31, 2023Rule: Revised Total Coliform RuleEnforcement: Resolving — corrective action underway
TIER 3Resolved

Exceeded the MCL for disinfection byproducts

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: January 1, 2023 – December 31, 2023Rule: Revised Total Coliform RuleEnforcement: Resolving — corrective action underway
TIER 3Resolved

Exceeded the MCL for disinfection byproducts

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: January 1, 2023 – December 31, 2023Rule: Revised Total Coliform RuleEnforcement: Resolving — corrective action underway
TIER 3Resolved

Exceeded the MCL for disinfection byproducts

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: January 1, 2023 – December 31, 2023Rule: Revised Total Coliform RuleEnforcement: Resolving — corrective action underway
TIER 3Resolved

Exceeded the MCL for disinfection byproducts

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: January 1, 2023 – December 31, 2023Rule: Revised Total Coliform RuleEnforcement: Resolving — corrective action underway
TIER 3Resolved

Exceeded the MCL for disinfection byproducts

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: January 1, 2023 – December 31, 2023Rule: Revised Total Coliform RuleEnforcement: Resolving — corrective action underway
TIER 3Resolved

Exceeded the MCL for disinfection byproducts

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: January 1, 2023 – December 31, 2023Rule: Revised Total Coliform RuleEnforcement: Resolving — corrective action underway
TIER 3Resolved

Exceeded the MCL for disinfection byproducts

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: January 1, 2023 – December 31, 2023Rule: Revised Total Coliform RuleEnforcement: Resolving — corrective action underway
TIER 3Resolved

Exceeded the MCL for disinfection byproducts

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: January 1, 2023 – December 31, 2023Rule: Revised Total Coliform RuleEnforcement: Resolving — corrective action underway
TIER 3Resolved

Exceeded the MCL for disinfection byproducts

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: January 1, 2023 – December 31, 2023Rule: Revised Total Coliform RuleEnforcement: Resolving — corrective action underway
TIER 3Resolved

Exceeded the MCL for disinfection byproducts

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: January 1, 2023 – December 31, 2023Rule: Revised Total Coliform RuleEnforcement: Resolving — corrective action underway
TIER 3Resolved

Exceeded the MCL for disinfection byproducts

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: January 1, 2023 – December 31, 2023Rule: Revised Total Coliform RuleEnforcement: Resolving — corrective action underway
TIER 3Resolved

Exceeded the MCL for disinfection byproducts

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: January 1, 2023 – December 31, 2023Rule: Revised Total Coliform RuleEnforcement: Resolving — corrective action underway
TIER 3Resolved

Exceeded the MCL for disinfection byproducts

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: January 1, 2023 – December 31, 2023Rule: Revised Total Coliform RuleEnforcement: Resolving — corrective action underway
TIER 3Resolved

Exceeded the MCL for disinfection byproducts

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: January 1, 2023 – December 31, 2023Rule: Revised Total Coliform RuleEnforcement: Resolving — corrective action underway
TIER 3Resolved

Exceeded the MCL for disinfection byproducts

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: January 1, 2023 – December 31, 2023Rule: Revised Total Coliform RuleEnforcement: Resolving — corrective action underway
TIER 3Resolved

Exceeded the MCL for disinfection byproducts

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: January 1, 2023 – December 31, 2023Rule: Revised Total Coliform RuleEnforcement: Resolving — corrective action underway
TIER 3Resolved

Exceeded the MCL for disinfection byproducts

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: January 1, 2023 – December 31, 2023Rule: Revised Total Coliform RuleEnforcement: Resolving — corrective action underway
TIER 3Resolved

Exceeded the MCL for disinfection byproducts

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: January 1, 2023 – December 31, 2023Rule: Revised Total Coliform RuleEnforcement: Resolving — corrective action underway
TIER 3Resolved

Exceeded the MCL for disinfection byproducts

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: January 1, 2023 – December 31, 2023Rule: Revised Total Coliform RuleEnforcement: Resolving — corrective action underway
TIER 3Resolved

Exceeded the MCL for disinfection byproducts

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: January 1, 2023 – December 31, 2023Rule: Revised Total Coliform RuleEnforcement: Resolving — corrective action underway
TIER 3Resolved

Exceeded the MCL for disinfection byproducts

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: January 1, 2023 – December 31, 2023Rule: Revised Total Coliform RuleEnforcement: Resolving — corrective action underway
TIER 3Resolved

Exceeded the MCL for disinfection byproducts

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: January 1, 2023 – December 31, 2023Rule: Revised Total Coliform RuleEnforcement: Resolving — corrective action underway
TIER 3Resolved

Exceeded the MCL for disinfection byproducts

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: January 1, 2023 – December 31, 2023Rule: Revised Total Coliform RuleEnforcement: Resolving — corrective action underway
TIER 3Resolved

Exceeded the MCL for disinfection byproducts

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: January 1, 2023 – December 31, 2023Rule: Revised Total Coliform RuleEnforcement: Resolving — corrective action underway
TIER 3Resolved

Exceeded the MCL for disinfection byproducts

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: January 1, 2023 – December 31, 2023Rule: Revised Total Coliform RuleEnforcement: Resolving — corrective action underway
TIER 3Resolved

Exceeded the MCL for disinfection byproducts

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: January 1, 2023 – December 31, 2023Rule: Revised Total Coliform RuleEnforcement: Resolving — corrective action underway
TIER 3Resolved

Exceeded the MCL for disinfection byproducts

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: January 1, 2023 – December 31, 2023Rule: Revised Total Coliform RuleEnforcement: Resolving — corrective action underway
TIER 3Resolved

Exceeded the MCL for disinfection byproducts

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: January 1, 2023 – December 31, 2023Rule: Revised Total Coliform RuleEnforcement: Resolving — corrective action underway
TIER 3Resolved

Exceeded the MCL for disinfection byproducts

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: January 1, 2023 – December 31, 2023Rule: Revised Total Coliform RuleEnforcement: Resolving — corrective action underway
TIER 3Resolved

Exceeded the MCL for disinfection byproducts

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: January 1, 2023 – December 31, 2023Rule: Revised Total Coliform RuleEnforcement: Resolving — corrective action underway
TIER 3Resolved

Exceeded the MCL for disinfection byproducts

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: January 1, 2023 – December 31, 2023Rule: Revised Total Coliform RuleEnforcement: Resolving — corrective action underway
TIER 3Resolved

Exceeded the MCL for disinfection byproducts

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: January 1, 2023 – December 31, 2023Rule: Revised Total Coliform RuleEnforcement: Resolving — corrective action underway
TIER 3Resolved

Exceeded the MCL for disinfection byproducts

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: January 1, 2023 – December 31, 2023Rule: Revised Total Coliform RuleEnforcement: Resolving — corrective action underway
TIER 3Resolved

Exceeded the MCL for disinfection byproducts

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: January 1, 2023 – December 31, 2023Rule: Revised Total Coliform RuleEnforcement: Resolving — corrective action underway
TIER 3Resolved

Exceeded the MCL for disinfection byproducts

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: January 1, 2023 – December 31, 2023Rule: Revised Total Coliform RuleEnforcement: Resolving — corrective action underway
TIER 3Resolved

Exceeded the MCL for disinfection byproducts

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: January 1, 2023 – December 31, 2023Rule: Revised Total Coliform RuleEnforcement: Resolving — corrective action underway
TIER 3Resolved

Exceeded the MCL for disinfection byproducts

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: January 1, 2023 – December 31, 2023Rule: Revised Total Coliform RuleEnforcement: Resolving — corrective action underway
TIER 3Resolved

Exceeded the MCL for disinfection byproducts

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: January 1, 2023 – December 31, 2023Rule: Revised Total Coliform RuleEnforcement: Resolving — corrective action underway
TIER 3Resolved

Exceeded the MCL for disinfection byproducts

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: January 1, 2023 – December 31, 2023Rule: Revised Total Coliform RuleEnforcement: Resolving — corrective action underway
TIER 3Resolved

Exceeded the MCL for disinfection byproducts

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: January 1, 2023 – December 31, 2023Rule: Revised Total Coliform RuleEnforcement: Resolving — corrective action underway
TIER 3Resolved

Exceeded the MCL for disinfection byproducts

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: January 1, 2023 – December 31, 2023Rule: Revised Total Coliform RuleEnforcement: Resolving — corrective action underway
TIER 3Resolved

Failed Level 2 Assessment under Revised Total Coliform Rule

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: October 1, 2022 – September 30, 2023Rule: Stage 2 DBPREnforcement: Resolving — corrective action underway
TIER 3Resolved

Consumer confidence report — inadequate or unavailable

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: July 1, 2022 – September 8, 2022Rule: Ground Water RuleEnforcement: Resolving — corrective action underway
TIER 3Resolved

Failed to complete routine monitoring

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: May 1, 2021 – May 31, 2021Rule: Surface Water Treatment RuleEnforcement: Resolving — corrective action underway
TIER 3Resolved

Failed to complete routine monitoring

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: May 1, 2021 – May 31, 2021Rule: Surface Water Treatment RuleEnforcement: Resolving — corrective action underway
TIER 3Resolved

Missed required monitoring deadline

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: May 1, 2021 – May 31, 2021Rule: Surface Water Treatment RuleEnforcement: Resolving — corrective action underway
TIER 3Resolved

Failed to complete routine monitoring

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: May 1, 2021 – May 31, 2021Rule: Surface Water Treatment RuleEnforcement: Resolving — corrective action underway
TIER 3Resolved

Missed required monitoring deadline

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: May 1, 2021 – May 31, 2021Rule: Surface Water Treatment RuleEnforcement: Resolving — corrective action underway
TIER 3Resolved

Failed to complete routine monitoring

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: May 1, 2021 – May 31, 2021Rule: Surface Water Treatment RuleEnforcement: Resolving — corrective action underway

Understanding violation severity

Tier 1Urgent health risk. Utility must notify all customers within 24 hours.Tier 2Important health or treatment issue. Customers notified within 30 days.Tier 3Administrative or monitoring issue. Reported in the annual water quality report.

Source: EPA Safe Drinking Water Information System (SDWIS) · Updated quarterly

Frequently Asked Questions About SW LINCOLN CO WATER PUD

Is SW LINCOLN CO WATER PUD water safe to drink?

SW LINCOLN CO WATER PUD water receives a grade of F (0/100), which is considered failing. 0 contaminant(s) exceed EPA legal limits and 144 violation(s) are on record. Customers may want to consider using a water filter.

What contaminants has SW LINCOLN CO WATER PUD detected?

1 contaminants were tested in SW LINCOLN CO WATER PUD's water. No contaminants exceed EPA legal limits or health goals, indicating good water quality management.

Does SW LINCOLN CO WATER PUD have any EPA violations?

Yes, SW LINCOLN CO WATER PUD has 144 EPA violation(s) on record, with the most recent in 2025. Violation types include MR, MON, TT. 1 are health-based violations.

How many people does SW LINCOLN CO WATER PUD serve?

SW LINCOLN CO WATER PUD serves approximately 3,000 people, Oregon.

What type of water does SW LINCOLN CO WATER PUD provide?

SW LINCOLN CO WATER PUD sources its water from surface water. Surface water comes from rivers, lakes, or reservoirs and typically requires more extensive treatment. The utility's system ID is OR4100925.

How does SW LINCOLN CO WATER PUD compare to other utilities in Oregon?

SW LINCOLN CO WATER PUD scores 0/100 with a grade of F (failing). This score suggests significant water quality concerns relative to other utilities. Visit our Oregon state page for a full comparison of water systems.