F0/100

ORANGE-ALAMANCE WATER SYSTEM — Water Quality Report 2026

Serving 9,223 people · North Carolina

Water Source
Surface Water
County
System ID
NC0368020
Violations
123

Contaminant Test Results

2 contaminants above EPA health goals
ContaminantDetectedLimit (MCL)Status
PFOS
0.012 µg/L0.004 µg/LOver Limit
PFOA
0.008 µg/L0.004 µg/LOver Limit

EPA Violation History

47

Violations (last 5yr)

1

Unresolved

1

Health-Related

TIER 2Unresolved

Treatment Technique Violation

When: July 1, 2025 – September 30, 2025Rule: Stage 1 DBPRVerify on EPA.gov
TIER 3Resolved

Failed Level 2 Assessment under Revised Total Coliform Rule

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: October 1, 2024 – December 31, 2024Rule: Stage 2 DBPREnforcement: Formal — state order issued
TIER 3Resolved

Failed Level 2 Assessment under Revised Total Coliform Rule

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: October 1, 2024 – December 31, 2024Rule: Stage 1 DBPREnforcement: Formal — state order issued
TIER 3Resolved

Failed Level 2 Assessment under Revised Total Coliform Rule

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: October 1, 2024 – December 31, 2024Rule: Stage 1 DBPREnforcement: Formal — state order issued
TIER 3Resolved

Failed Level 2 Assessment under Revised Total Coliform Rule

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: October 1, 2024 – December 31, 2024Rule: Stage 1 DBPREnforcement: Formal — state order issued
TIER 3Resolved

Failed Level 2 Assessment under Revised Total Coliform Rule

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: October 1, 2024 – December 31, 2024Rule: Stage 1 DBPREnforcement: Formal — state order issued
TIER 3Resolved

Surface water treatment technique failure

When: July 1, 2024 – November 14, 2024Enforcement: Resolving — corrective action underway
TIER 3Resolved

Exceeded the MCL for disinfection byproducts

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: January 1, 2024 – December 31, 2024Rule: Revised Total Coliform RuleEnforcement: Formal — state order issued
TIER 3Resolved

Exceeded the MCL for disinfection byproducts

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: January 1, 2024 – December 31, 2024Rule: Revised Total Coliform RuleEnforcement: Formal — state order issued
TIER 3Resolved

Exceeded the MCL for disinfection byproducts

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: January 1, 2024 – December 31, 2024Enforcement: Formal — state order issued
TIER 3Resolved

Exceeded the MCL for disinfection byproducts

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: January 1, 2024 – December 31, 2024Enforcement: Formal — state order issued
TIER 3Resolved

Exceeded the MCL for disinfection byproducts

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: January 1, 2024 – December 31, 2024Enforcement: Formal — state order issued
TIER 3Resolved

Exceeded the MCL for disinfection byproducts

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: January 1, 2024 – December 31, 2024Enforcement: Formal — state order issued
TIER 3Resolved

Exceeded the MCL for disinfection byproducts

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: January 1, 2024 – December 31, 2024Enforcement: Formal — state order issued
TIER 3Resolved

Exceeded the MCL for disinfection byproducts

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: January 1, 2024 – December 31, 2024Enforcement: Formal — state order issued
TIER 3Resolved

Exceeded the MCL for disinfection byproducts

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: January 1, 2024 – December 31, 2024Enforcement: Formal — state order issued
TIER 3Resolved

Exceeded the MCL for disinfection byproducts

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: January 1, 2024 – December 31, 2024Rule: Revised Total Coliform RuleEnforcement: Formal — state order issued
TIER 3Resolved

Exceeded the MCL for disinfection byproducts

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: January 1, 2024 – December 31, 2024Enforcement: Formal — state order issued
TIER 3Resolved

Exceeded the MCL for disinfection byproducts

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: January 1, 2024 – December 31, 2024Enforcement: Formal — state order issued
TIER 3Resolved

Exceeded the MCL for disinfection byproducts

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: January 1, 2024 – December 31, 2024Enforcement: Formal — state order issued
TIER 3Resolved

Exceeded the MCL for disinfection byproducts

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: January 1, 2024 – December 31, 2024Enforcement: Formal — state order issued
TIER 3Resolved

Exceeded the MCL for disinfection byproducts

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: January 1, 2024 – December 31, 2024Rule: Revised Total Coliform RuleEnforcement: Formal — state order issued
TIER 3Resolved

Exceeded the MCL for disinfection byproducts

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: January 1, 2024 – December 31, 2024Rule: Revised Total Coliform RuleEnforcement: Formal — state order issued
TIER 3Resolved

Exceeded the MCL for disinfection byproducts

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: January 1, 2024 – December 31, 2024Rule: Revised Total Coliform RuleEnforcement: Formal — state order issued
TIER 3Resolved

Exceeded the MCL for disinfection byproducts

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: January 1, 2024 – December 31, 2024Rule: Revised Total Coliform RuleEnforcement: Formal — state order issued
TIER 3Resolved

Exceeded the MCL for disinfection byproducts

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: January 1, 2024 – December 31, 2024Rule: Revised Total Coliform RuleEnforcement: Formal — state order issued
TIER 3Resolved

Exceeded the MCL for disinfection byproducts

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: January 1, 2024 – December 31, 2024Rule: Revised Total Coliform RuleEnforcement: Formal — state order issued
TIER 3Resolved

Exceeded the MCL for disinfection byproducts

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: January 1, 2024 – December 31, 2024Rule: Revised Total Coliform RuleEnforcement: Formal — state order issued
TIER 3Resolved

Exceeded the MCL for disinfection byproducts

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: January 1, 2024 – December 31, 2024Rule: Revised Total Coliform RuleEnforcement: Formal — state order issued
TIER 3Resolved

Exceeded the MCL for disinfection byproducts

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: January 1, 2024 – December 31, 2024Rule: Revised Total Coliform RuleEnforcement: Formal — state order issued
TIER 3Resolved

Exceeded the MCL for disinfection byproducts

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: January 1, 2024 – December 31, 2024Rule: Revised Total Coliform RuleEnforcement: Formal — state order issued
TIER 3Resolved

Exceeded the MCL for disinfection byproducts

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: January 1, 2024 – December 31, 2024Rule: Revised Total Coliform RuleEnforcement: Formal — state order issued
TIER 3Resolved

Exceeded the MCL for disinfection byproducts

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: January 1, 2024 – December 31, 2024Rule: Revised Total Coliform RuleEnforcement: Formal — state order issued
TIER 3Resolved

Exceeded the MCL for disinfection byproducts

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: January 1, 2024 – December 31, 2024Enforcement: Formal — state order issued
TIER 3Resolved

Exceeded the MCL for disinfection byproducts

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: January 1, 2024 – December 31, 2024Rule: Revised Total Coliform RuleEnforcement: Formal — state order issued
TIER 3Resolved

Exceeded the MCL for disinfection byproducts

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: January 1, 2024 – December 31, 2024Rule: Revised Total Coliform RuleEnforcement: Formal — state order issued
TIER 3Resolved

Exceeded the MCL for disinfection byproducts

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: January 1, 2024 – December 31, 2024Rule: Revised Total Coliform RuleEnforcement: Formal — state order issued
TIER 3Resolved

Exceeded the MCL for disinfection byproducts

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: January 1, 2024 – December 31, 2024Rule: Revised Total Coliform RuleEnforcement: Formal — state order issued
TIER 3Resolved

Exceeded the MCL for disinfection byproducts

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: January 1, 2024 – December 31, 2024Rule: Revised Total Coliform RuleEnforcement: Formal — state order issued
TIER 3Resolved

Exceeded the MCL for disinfection byproducts

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: January 1, 2024 – December 31, 2024Enforcement: Formal — state order issued
TIER 3Resolved

Exceeded the MCL for disinfection byproducts

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: January 1, 2024 – December 31, 2024Rule: Revised Total Coliform RuleEnforcement: Formal — state order issued
TIER 3Resolved

Surface water treatment technique failure

When: July 1, 2023 – November 7, 2023Enforcement: Resolving — corrective action underway
TIER 3Resolved

Monitoring violation

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: April 1, 2023 – May 17, 2023Rule: Total Coliform RuleEnforcement: Formal — state order issued
TIER 3Resolved

Monitoring violation

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: March 11, 2023 – February 9, 2023Rule: Total Coliform RuleEnforcement: Formal — state order issued
TIER 3Resolved

Monitoring / Reporting Violation

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: January 1, 2023 – April 4, 2023Rule: Ground Water RuleEnforcement: Formal — state order issued
TIER 3Resolved

Monitoring Violation

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: August 1, 2022 – August 31, 2022Rule: Total Coliform RuleEnforcement: Formal — state order issued
TIER 3Resolved

Failed Level 2 Assessment under Revised Total Coliform Rule

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: July 1, 2022 – September 30, 2022Rule: Stage 1 DBPREnforcement: Formal — state order issued

Understanding violation severity

Tier 1Urgent health risk. Utility must notify all customers within 24 hours.Tier 2Important health or treatment issue. Customers notified within 30 days.Tier 3Administrative or monitoring issue. Reported in the annual water quality report.

Source: EPA Safe Drinking Water Information System (SDWIS) · Updated quarterly

Frequently Asked Questions About ORANGE-ALAMANCE WATER SYSTEM

Is ORANGE-ALAMANCE WATER SYSTEM water safe to drink?

ORANGE-ALAMANCE WATER SYSTEM water receives a grade of F (0/100), which is considered failing. 2 contaminant(s) exceed EPA legal limits and 123 violation(s) are on record. Customers may want to consider using a water filter.

What contaminants has ORANGE-ALAMANCE WATER SYSTEM detected?

51 contaminants were tested in ORANGE-ALAMANCE WATER SYSTEM's water. Notable contaminants include PFOS, PFOA. 2 exceed EPA legal limits (MCLs). 2 exceed EPA health goals (MCLGs).

Does ORANGE-ALAMANCE WATER SYSTEM have any EPA violations?

Yes, ORANGE-ALAMANCE WATER SYSTEM has 123 EPA violation(s) on record, with the most recent in 2025. Violation types include TT, MR, Other. 9 are health-based violations.

How many people does ORANGE-ALAMANCE WATER SYSTEM serve?

ORANGE-ALAMANCE WATER SYSTEM serves approximately 9,223 people, North Carolina. The system provides water to 1 community: Efland.

What type of water does ORANGE-ALAMANCE WATER SYSTEM provide?

ORANGE-ALAMANCE WATER SYSTEM sources its water from surface water. Surface water comes from rivers, lakes, or reservoirs and typically requires more extensive treatment. The utility's system ID is NC0368020.

How does ORANGE-ALAMANCE WATER SYSTEM compare to other utilities in North Carolina?

ORANGE-ALAMANCE WATER SYSTEM scores 0/100 with a grade of F (failing). This score suggests significant water quality concerns relative to other utilities. Visit our North Carolina state page for a full comparison of water systems.

Cities Served