KATHERINE LANDING DWTP — Water Quality Report 2026

Serving 1,300 people · Nevada

Water Source
Surface Water
County
System ID
AZ0408701
Violations
620

Contaminant Test Results

1 contaminant above EPA health goals
ContaminantDetectedLimit (MCL)Status
Lead (90th percentile)
0.002 mg/L0.015 mg/LAbove Goal

EPA Violation History

67

Violations (last 5yr)

2

Unresolved

10

Health-Related

TIER 3Resolved

Disinfection byproduct treatment technique failure

When: May 1, 2025 – June 24, 2025Rule: Ground Water RuleEnforcement: Resolving — corrective action underway
TIER 3Resolved

Failed to conduct Level 2 Assessment

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: April 1, 2025 – June 24, 2025Rule: Stage 2 DBPREnforcement: Formal — state order issued
TIER 3Resolved

Disinfection byproduct treatment technique failure

When: January 31, 2025 – June 24, 2025Rule: Ground Water RuleEnforcement: Resolving — corrective action underway
TIER 2Resolved

Exceeded the Maximum Contaminant Level (running average)

When: January 1, 2025 – December 17, 2024Rule: Stage 2 DBPREnforcement: Formal — state order issued
TIER 3Unresolved

Disinfection byproduct treatment technique failure

When: December 2, 2024Rule: Ground Water RuleEnforcement: Informal — resolved cooperativelyVerify on EPA.gov
TIER 2Resolved

Exceeded the Maximum Contaminant Level (running average)

When: October 1, 2024 – December 17, 2024Rule: Stage 2 DBPREnforcement: Formal — state order issued
TIER 2Resolved

Exceeded the Maximum Contaminant Level (running average)

When: July 1, 2024 – September 30, 2024Rule: Stage 2 DBPREnforcement: Formal — state order issued
TIER 3Resolved

Failed to conduct Level 2 Assessment

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: June 30, 2024 – August 15, 2024Rule: Stage 2 DBPREnforcement: Formal — state order issued
TIER 3Resolved

Monitoring Violation

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: June 1, 2024 – June 30, 2024Rule: Total Coliform RuleEnforcement: Resolving — corrective action underway
TIER 3Resolved

Monitoring violation

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: May 1, 2024 – September 13, 2024Rule: Total Coliform RuleEnforcement: Resolving — corrective action underway
TIER 3Resolved

Failed Level 2 Assessment under Revised Total Coliform Rule

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: April 1, 2024 – April 30, 2024Rule: Stage 1 DBPREnforcement: Resolving — corrective action underway
TIER 2Resolved

Exceeded the Maximum Contaminant Level (running average)

When: April 1, 2024 – June 30, 2024Rule: Stage 2 DBPREnforcement: Formal — state order issued
TIER 3Resolved

Failed Level 2 Assessment under Revised Total Coliform Rule

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: March 1, 2024 – March 31, 2024Rule: Stage 1 DBPREnforcement: Resolving — corrective action underway
TIER 3Resolved

Failed Level 2 Assessment under Revised Total Coliform Rule

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: February 1, 2024 – February 29, 2024Rule: Stage 1 DBPREnforcement: Resolving — corrective action underway
TIER 3Unresolved

Disinfection byproduct treatment technique failure

When: January 2, 2024Rule: Ground Water RuleEnforcement: Informal — resolved cooperativelyVerify on EPA.gov
TIER 3Resolved

Failed Level 2 Assessment under Revised Total Coliform Rule

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: January 1, 2024 – January 31, 2024Rule: Stage 1 DBPREnforcement: Resolving — corrective action underway
TIER 2Resolved

Exceeded the Maximum Contaminant Level (running average)

When: January 1, 2024 – March 31, 2024Rule: Stage 2 DBPREnforcement: Formal — state order issued
TIER 3Resolved

Failed to complete routine monitoring

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: November 1, 2023 – November 30, 2023Rule: Surface Water Treatment RuleEnforcement: Resolving — corrective action underway
TIER 3Resolved

Failed Level 2 Assessment under Revised Total Coliform Rule

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: October 1, 2023 – December 31, 2023Rule: Stage 2 DBPREnforcement: Resolving — corrective action underway
TIER 3Resolved

Failed Level 2 Assessment under Revised Total Coliform Rule

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: October 1, 2023 – December 31, 2023Rule: Stage 1 DBPREnforcement: Resolving — corrective action underway
TIER 2Resolved

Exceeded the Maximum Contaminant Level (running average)

When: October 1, 2023 – December 31, 2023Rule: Stage 2 DBPREnforcement: Formal — state order issued
TIER 3Resolved

Failed Level 2 Assessment under Revised Total Coliform Rule

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: October 1, 2023 – December 31, 2023Rule: Stage 2 DBPREnforcement: Resolving — corrective action underway
TIER 3Resolved

Disinfection byproduct treatment technique failure

When: August 6, 2023 – January 8, 2024Rule: Ground Water RuleEnforcement: Resolving — corrective action underway
TIER 3Resolved

Failed Level 2 Assessment under Revised Total Coliform Rule

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: July 1, 2023 – September 30, 2023Rule: Stage 2 DBPREnforcement: Resolving — corrective action underway
TIER 3Resolved

Failed Level 2 Assessment under Revised Total Coliform Rule

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: July 1, 2023 – September 30, 2023Rule: Stage 1 DBPREnforcement: Resolving — corrective action underway
TIER 2Resolved

Exceeded the Maximum Contaminant Level (running average)

When: July 1, 2023 – September 30, 2023Rule: Stage 2 DBPREnforcement: Formal — state order issued
TIER 3Resolved

Failed Level 2 Assessment under Revised Total Coliform Rule

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: July 1, 2023 – September 30, 2023Rule: Stage 2 DBPREnforcement: Resolving — corrective action underway
TIER 3Resolved

Exceeded the MCL for disinfection byproducts

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: April 1, 2023 – June 30, 2023Rule: Revised Total Coliform RuleEnforcement: Resolving — corrective action underway
TIER 3Resolved

Exceeded the MCL for disinfection byproducts

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: April 1, 2023 – June 30, 2023Rule: Revised Total Coliform RuleEnforcement: Resolving — corrective action underway
TIER 3Resolved

Exceeded the MCL for disinfection byproducts

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: April 1, 2023 – June 30, 2023Enforcement: Resolving — corrective action underway
TIER 3Resolved

Exceeded the MCL for disinfection byproducts

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: April 1, 2023 – June 30, 2023Rule: Revised Total Coliform RuleEnforcement: Resolving — corrective action underway
TIER 2Resolved

Exceeded the Maximum Contaminant Level (running average)

When: April 1, 2023 – June 30, 2023Rule: Stage 2 DBPREnforcement: Formal — state order issued
TIER 3Resolved

Exceeded the MCL for disinfection byproducts

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: April 1, 2023 – June 30, 2023Rule: Revised Total Coliform RuleEnforcement: Resolving — corrective action underway
TIER 3Resolved

Exceeded the MCL for disinfection byproducts

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: April 1, 2023 – June 30, 2023Rule: Revised Total Coliform RuleEnforcement: Resolving — corrective action underway
TIER 3Resolved

Exceeded the MCL for disinfection byproducts

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: April 1, 2023 – June 30, 2023Rule: Revised Total Coliform RuleEnforcement: Resolving — corrective action underway
TIER 3Resolved

Exceeded the MCL for disinfection byproducts

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: April 1, 2023 – June 30, 2023Rule: Revised Total Coliform RuleEnforcement: Resolving — corrective action underway
TIER 3Resolved

Exceeded the MCL for disinfection byproducts

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: April 1, 2023 – June 30, 2023Rule: Revised Total Coliform RuleEnforcement: Resolving — corrective action underway
TIER 3Resolved

Exceeded the MCL for disinfection byproducts

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: April 1, 2023 – June 30, 2023Rule: Revised Total Coliform RuleEnforcement: Resolving — corrective action underway
TIER 3Resolved

Exceeded the MCL for disinfection byproducts

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: April 1, 2023 – June 30, 2023Rule: Revised Total Coliform RuleEnforcement: Resolving — corrective action underway
TIER 3Resolved

Exceeded the MCL for disinfection byproducts

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: April 1, 2023 – June 30, 2023Rule: Revised Total Coliform RuleEnforcement: Resolving — corrective action underway
TIER 3Resolved

Exceeded the MCL for disinfection byproducts

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: April 1, 2023 – June 30, 2023Rule: Revised Total Coliform RuleEnforcement: Resolving — corrective action underway
TIER 3Resolved

Exceeded the MCL for disinfection byproducts

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: April 1, 2023 – June 30, 2023Rule: Revised Total Coliform RuleEnforcement: Resolving — corrective action underway
TIER 3Resolved

Exceeded the MCL for disinfection byproducts

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: April 1, 2023 – June 30, 2023Rule: Revised Total Coliform RuleEnforcement: Resolving — corrective action underway
TIER 3Resolved

Exceeded the MCL for disinfection byproducts

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: April 1, 2023 – June 30, 2023Rule: Revised Total Coliform RuleEnforcement: Resolving — corrective action underway
TIER 3Resolved

Exceeded the MCL for disinfection byproducts

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: April 1, 2023 – June 30, 2023Rule: Revised Total Coliform RuleEnforcement: Resolving — corrective action underway
TIER 3Resolved

Exceeded the MCL for disinfection byproducts

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: April 1, 2023 – June 30, 2023Rule: Revised Total Coliform RuleEnforcement: Resolving — corrective action underway
TIER 3Resolved

Exceeded the MCL for disinfection byproducts

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: April 1, 2023 – June 30, 2023Rule: Revised Total Coliform RuleEnforcement: Resolving — corrective action underway
TIER 3Resolved

Exceeded the MCL for disinfection byproducts

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: April 1, 2023 – June 30, 2023Rule: Revised Total Coliform RuleEnforcement: Resolving — corrective action underway
TIER 3Resolved

Exceeded the MCL for disinfection byproducts

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: April 1, 2023 – June 30, 2023Rule: Revised Total Coliform RuleEnforcement: Resolving — corrective action underway
TIER 3Resolved

Exceeded the MCL for disinfection byproducts

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: April 1, 2023 – June 30, 2023Rule: Revised Total Coliform RuleEnforcement: Resolving — corrective action underway
TIER 2Resolved

Exceeded the Maximum Contaminant Level (running average)

When: January 1, 2023 – March 31, 2023Rule: Stage 2 DBPREnforcement: Formal — state order issued
TIER 3Resolved

Failed to conduct Level 2 Assessment

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: December 13, 2022 – June 27, 2023Rule: Stage 2 DBPREnforcement: Resolving — corrective action underway
TIER 3Resolved

Failed Level 2 Assessment under Revised Total Coliform Rule

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: October 1, 2022 – December 31, 2022Rule: Stage 1 DBPREnforcement: Resolving — corrective action underway
TIER 3Resolved

Failed Level 2 Assessment under Revised Total Coliform Rule

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: October 1, 2022 – December 31, 2022Rule: Stage 2 DBPREnforcement: Resolving — corrective action underway
TIER 3Resolved

Exceeded the MCL for disinfection byproducts

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: October 1, 2022 – December 31, 2022Enforcement: Resolving — corrective action underway
TIER 3Resolved

Failed Level 2 Assessment under Revised Total Coliform Rule

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: October 1, 2022 – December 31, 2022Rule: Stage 2 DBPREnforcement: Resolving — corrective action underway
TIER 3Resolved

Failed Level 2 Assessment under Revised Total Coliform Rule

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: July 1, 2022 – September 30, 2022Rule: Stage 2 DBPREnforcement: Resolving — corrective action underway
TIER 2Resolved

Exceeded the Maximum Contaminant Level (running average)

When: July 1, 2022 – September 30, 2022Rule: Stage 2 DBPREnforcement: Formal — state order issued
TIER 3Resolved

Failed Level 2 Assessment under Revised Total Coliform Rule

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: July 1, 2022 – September 30, 2022Rule: Stage 2 DBPREnforcement: Resolving — corrective action underway
TIER 3Resolved

Monitoring violation

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: May 1, 2022 – July 5, 2022Rule: Total Coliform RuleEnforcement: Resolving — corrective action underway
TIER 3Resolved

Failed Level 2 Assessment under Revised Total Coliform Rule

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: April 1, 2022 – June 30, 2022Rule: Stage 2 DBPREnforcement: Resolving — corrective action underway
TIER 3Resolved

Failed Level 2 Assessment under Revised Total Coliform Rule

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: April 1, 2022 – June 30, 2022Rule: Stage 1 DBPREnforcement: Resolving — corrective action underway
TIER 3Resolved

Failed Level 2 Assessment under Revised Total Coliform Rule

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: April 1, 2022 – June 30, 2022Rule: Stage 2 DBPREnforcement: Resolving — corrective action underway
TIER 3Resolved

Monitoring violation

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: March 1, 2022 – May 16, 2022Rule: Total Coliform RuleEnforcement: Resolving — corrective action underway
TIER 3Resolved

Failed Level 2 Assessment under Revised Total Coliform Rule

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: January 1, 2022 – March 31, 2022Rule: Stage 1 DBPREnforcement: Resolving — corrective action underway
TIER 3Resolved

Failed to complete routine monitoring

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: October 1, 2021 – October 31, 2021Rule: Surface Water Treatment RuleEnforcement: Resolving — corrective action underway
TIER 3Resolved

Missed required monitoring deadline

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: October 1, 2021 – October 31, 2021Rule: Surface Water Treatment RuleEnforcement: Resolving — corrective action underway

Understanding violation severity

Tier 1Urgent health risk. Utility must notify all customers within 24 hours.Tier 2Important health or treatment issue. Customers notified within 30 days.Tier 3Administrative or monitoring issue. Reported in the annual water quality report.

Source: EPA Safe Drinking Water Information System (SDWIS) · Updated quarterly

Frequently Asked Questions About KATHERINE LANDING DWTP

Is KATHERINE LANDING DWTP water safe to drink?

KATHERINE LANDING DWTP water receives a grade of F (0/100), which is considered failing. 0 contaminant(s) exceed EPA legal limits and 620 violation(s) are on record. Customers may want to consider using a water filter.

What contaminants has KATHERINE LANDING DWTP detected?

1 contaminants were tested in KATHERINE LANDING DWTP's water. Notable contaminants include Lead (90th percentile). No contaminants exceed EPA legal limits. 1 exceed EPA health goals (MCLGs).

Does KATHERINE LANDING DWTP have any EPA violations?

Yes, KATHERINE LANDING DWTP has 620 EPA violation(s) on record, with the most recent in 2025. Violation types include Other, MR, MCL. 30 are health-based violations.

How many people does KATHERINE LANDING DWTP serve?

KATHERINE LANDING DWTP serves approximately 1,300 people, Nevada. The system provides water to 1 community: Katherine Landing.

What type of water does KATHERINE LANDING DWTP provide?

KATHERINE LANDING DWTP sources its water from surface water. Surface water comes from rivers, lakes, or reservoirs and typically requires more extensive treatment. The utility's system ID is AZ0408701.

How does KATHERINE LANDING DWTP compare to other utilities in Nevada?

KATHERINE LANDING DWTP scores 0/100 with a grade of F (failing). This score suggests significant water quality concerns relative to other utilities. Visit our Nevada state page for a full comparison of water systems.

Cities Served