F0/100

FLOWING WELLS IRRIGATION DISTRICT — Water Quality Report 2026

Serving 16,000 people · Arizona

Water Source
Groundwater
County
System ID
AZ0410051
Violations
805

Contaminant Test Results

3 contaminants above EPA health goals
ContaminantDetectedLimit (MCL)Status
PFOA
0.005 µg/L0.004 µg/LOver Limit
chlorate
270.00 µg/LAbove Goal
PFOS
0.004 µg/L0.004 µg/LAbove Goal

EPA Violation History

54

Violations (last 5yr)

42

Unresolved

1

Health-Related

TIER 3Unresolved

Exceeded the MCL for disinfection byproducts

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: July 1, 2025 – September 30, 2025Rule: Revised Total Coliform RuleVerify on EPA.gov
TIER 3Unresolved

Exceeded the MCL for disinfection byproducts

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: July 1, 2025 – September 30, 2025Rule: Revised Total Coliform RuleVerify on EPA.gov
TIER 3Unresolved

Exceeded the MCL for disinfection byproducts

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: July 1, 2025 – September 30, 2025Rule: Revised Total Coliform RuleVerify on EPA.gov
TIER 3Unresolved

Exceeded the MCL for disinfection byproducts

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: July 1, 2025 – September 30, 2025Rule: Revised Total Coliform RuleVerify on EPA.gov
TIER 3Unresolved

Exceeded the MCL for disinfection byproducts

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: July 1, 2025 – September 30, 2025Rule: Revised Total Coliform RuleVerify on EPA.gov
TIER 3Unresolved

Exceeded the MCL for disinfection byproducts

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: July 1, 2025 – September 30, 2025Rule: Revised Total Coliform RuleVerify on EPA.gov
TIER 3Unresolved

Exceeded the MCL for disinfection byproducts

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: July 1, 2025 – September 30, 2025Rule: Revised Total Coliform RuleVerify on EPA.gov
TIER 3Unresolved

Exceeded the MCL for disinfection byproducts

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: July 1, 2025 – September 30, 2025Rule: Revised Total Coliform RuleVerify on EPA.gov
TIER 3Unresolved

Exceeded the MCL for disinfection byproducts

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: July 1, 2025 – September 30, 2025Rule: Revised Total Coliform RuleVerify on EPA.gov
TIER 3Unresolved

Exceeded the MCL for disinfection byproducts

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: July 1, 2025 – September 30, 2025Rule: Revised Total Coliform RuleVerify on EPA.gov
TIER 3Unresolved

Exceeded the MCL for disinfection byproducts

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: July 1, 2025 – September 30, 2025Rule: Revised Total Coliform RuleVerify on EPA.gov
TIER 3Unresolved

Exceeded the MCL for disinfection byproducts

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: July 1, 2025 – September 30, 2025Rule: Revised Total Coliform RuleVerify on EPA.gov
TIER 3Unresolved

Exceeded the MCL for disinfection byproducts

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: July 1, 2025 – September 30, 2025Rule: Revised Total Coliform RuleVerify on EPA.gov
TIER 3Unresolved

Exceeded the MCL for disinfection byproducts

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: July 1, 2025 – September 30, 2025Rule: Revised Total Coliform RuleVerify on EPA.gov
TIER 3Unresolved

Exceeded the MCL for disinfection byproducts

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: July 1, 2025 – September 30, 2025Rule: Revised Total Coliform RuleVerify on EPA.gov
TIER 3Unresolved

Exceeded the MCL for disinfection byproducts

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: July 1, 2025 – September 30, 2025Rule: Revised Total Coliform RuleVerify on EPA.gov
TIER 3Unresolved

Exceeded the MCL for disinfection byproducts

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: July 1, 2025 – September 30, 2025Rule: Revised Total Coliform RuleVerify on EPA.gov
TIER 3Unresolved

Exceeded the MCL for disinfection byproducts

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: July 1, 2025 – September 30, 2025Rule: Revised Total Coliform RuleVerify on EPA.gov
TIER 3Unresolved

Exceeded the MCL for disinfection byproducts

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: July 1, 2025 – September 30, 2025Rule: Revised Total Coliform RuleVerify on EPA.gov
TIER 3Unresolved

Exceeded the MCL for disinfection byproducts

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: July 1, 2025 – September 30, 2025Rule: Revised Total Coliform RuleVerify on EPA.gov
TIER 3Unresolved

Exceeded the MCL for disinfection byproducts

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: July 1, 2025 – September 30, 2025Rule: Revised Total Coliform RuleVerify on EPA.gov
TIER 3Unresolved

Exceeded the MCL for disinfection byproducts

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: July 1, 2025 – September 30, 2025Rule: Revised Total Coliform RuleVerify on EPA.gov
TIER 3Unresolved

Exceeded the MCL for disinfection byproducts

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: July 1, 2025 – September 30, 2025Rule: Revised Total Coliform RuleVerify on EPA.gov
TIER 3Unresolved

Exceeded the MCL for disinfection byproducts

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: July 1, 2025 – September 30, 2025Rule: Revised Total Coliform RuleVerify on EPA.gov
TIER 3Unresolved

Exceeded the MCL for disinfection byproducts

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: July 1, 2025 – September 30, 2025Rule: Revised Total Coliform RuleVerify on EPA.gov
TIER 3Unresolved

Exceeded the MCL for disinfection byproducts

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: July 1, 2025 – September 30, 2025Rule: Revised Total Coliform RuleVerify on EPA.gov
TIER 3Unresolved

Exceeded the MCL for disinfection byproducts

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: July 1, 2025 – September 30, 2025Rule: Revised Total Coliform RuleVerify on EPA.gov
TIER 3Unresolved

Exceeded the MCL for disinfection byproducts

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: July 1, 2025 – September 30, 2025Rule: Revised Total Coliform RuleVerify on EPA.gov
TIER 3Unresolved

Exceeded the MCL for disinfection byproducts

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: July 1, 2025 – September 30, 2025Rule: Revised Total Coliform RuleVerify on EPA.gov
TIER 3Unresolved

Exceeded the MCL for disinfection byproducts

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: July 1, 2025 – September 30, 2025Rule: Revised Total Coliform RuleVerify on EPA.gov
TIER 3Unresolved

Exceeded the MCL for disinfection byproducts

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: July 1, 2025 – September 30, 2025Rule: Revised Total Coliform RuleVerify on EPA.gov
TIER 3Unresolved

Exceeded the MCL for disinfection byproducts

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: July 1, 2025 – September 30, 2025Rule: Revised Total Coliform RuleVerify on EPA.gov
TIER 3Unresolved

Exceeded the MCL for disinfection byproducts

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: July 1, 2025 – September 30, 2025Rule: Revised Total Coliform RuleVerify on EPA.gov
TIER 3Unresolved

Exceeded the MCL for disinfection byproducts

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: July 1, 2025 – September 30, 2025Rule: Revised Total Coliform RuleVerify on EPA.gov
TIER 3Unresolved

Exceeded the MCL for disinfection byproducts

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: July 1, 2025 – September 30, 2025Rule: Revised Total Coliform RuleVerify on EPA.gov
TIER 3Unresolved

Exceeded the MCL for disinfection byproducts

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: July 1, 2025 – September 30, 2025Rule: Revised Total Coliform RuleVerify on EPA.gov
TIER 3Unresolved

Exceeded the MCL for disinfection byproducts

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: July 1, 2025 – September 30, 2025Rule: Revised Total Coliform RuleVerify on EPA.gov
TIER 3Unresolved

Exceeded the MCL for disinfection byproducts

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: July 1, 2025 – September 30, 2025Rule: Revised Total Coliform RuleVerify on EPA.gov
TIER 3Unresolved

Exceeded the MCL for disinfection byproducts

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: July 1, 2025 – September 30, 2025Rule: Revised Total Coliform RuleVerify on EPA.gov
TIER 3Unresolved

Exceeded the MCL for disinfection byproducts

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: July 1, 2025 – September 30, 2025Rule: Revised Total Coliform RuleVerify on EPA.gov
TIER 3Unresolved

Exceeded the MCL for disinfection byproducts

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: July 1, 2025 – September 30, 2025Rule: Revised Total Coliform RuleVerify on EPA.gov
TIER 3Unresolved

Exceeded the MCL for disinfection byproducts

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: July 1, 2025 – September 30, 2025Rule: Revised Total Coliform RuleVerify on EPA.gov
TIER 3Resolved

Disinfection byproduct treatment technique failure

When: April 12, 2025 – June 27, 2025Rule: Ground Water RuleEnforcement: Resolving — corrective action underway
TIER 3Resolved

Disinfection byproduct treatment technique failure

When: December 20, 2024 – May 15, 2025Rule: Ground Water RuleEnforcement: Resolving — corrective action underway
TIER 3Resolved

Reporting violation

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: October 17, 2024 – October 22, 2024Rule: Ground Water RuleEnforcement: Resolving — corrective action underway
TIER 2Resolved

Treatment technique violation

When: October 17, 2024 – October 22, 2024Rule: Ground Water RuleEnforcement: Resolving — corrective action underway
TIER 3Resolved

Failed Level 2 Assessment under Revised Total Coliform Rule

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: January 1, 2024 – March 31, 2024Rule: Stage 2 DBPREnforcement: Resolving — corrective action underway
TIER 3Resolved

Failed Level 2 Assessment under Revised Total Coliform Rule

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: January 1, 2024 – March 31, 2024Rule: Stage 2 DBPREnforcement: Resolving — corrective action underway
TIER 3Resolved

Monitoring Violation

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: November 1, 2023 – November 30, 2023Rule: Total Coliform RuleEnforcement: Resolving — corrective action underway
TIER 3Resolved

Failed Level 2 Assessment under Revised Total Coliform Rule

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: October 1, 2023 – December 31, 2023Rule: Stage 2 DBPREnforcement: Resolving — corrective action underway
TIER 3Resolved

Failed Level 2 Assessment under Revised Total Coliform Rule

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: October 1, 2023 – December 31, 2023Rule: Stage 2 DBPREnforcement: Resolving — corrective action underway
TIER 3Resolved

Exceeded the MCL for disinfection byproducts

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: April 1, 2023 – June 30, 2023Enforcement: Resolving — corrective action underway
TIER 3Resolved

Monitoring / Reporting Violation

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: January 1, 2023 – February 10, 2023Rule: Ground Water RuleEnforcement: Resolving — corrective action underway
TIER 3Resolved

Failed Level 2 Assessment under Revised Total Coliform Rule

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: July 1, 2021 – September 30, 2021Rule: Stage 1 DBPREnforcement: Resolving — corrective action underway

Understanding violation severity

Tier 1Urgent health risk. Utility must notify all customers within 24 hours.Tier 2Important health or treatment issue. Customers notified within 30 days.Tier 3Administrative or monitoring issue. Reported in the annual water quality report.

Source: EPA Safe Drinking Water Information System (SDWIS) · Updated quarterly

Frequently Asked Questions About FLOWING WELLS IRRIGATION DISTRICT

Is FLOWING WELLS IRRIGATION DISTRICT water safe to drink?

FLOWING WELLS IRRIGATION DISTRICT water receives a grade of F (0/100), which is considered failing. 1 contaminant(s) exceed EPA legal limits and 805 violation(s) are on record. Customers may want to consider using a water filter.

What contaminants has FLOWING WELLS IRRIGATION DISTRICT detected?

66 contaminants were tested in FLOWING WELLS IRRIGATION DISTRICT's water. Notable contaminants include PFOA, PFOS, chlorate. 1 exceed EPA legal limits (MCLs). 3 exceed EPA health goals (MCLGs).

Does FLOWING WELLS IRRIGATION DISTRICT have any EPA violations?

Yes, FLOWING WELLS IRRIGATION DISTRICT has 805 EPA violation(s) on record, with the most recent in 2025. Violation types include MR, Other, RPT. 2 are health-based violations.

How many people does FLOWING WELLS IRRIGATION DISTRICT serve?

FLOWING WELLS IRRIGATION DISTRICT serves approximately 16,000 people, Arizona. The system provides water to 1 community: Tucson.

What type of water does FLOWING WELLS IRRIGATION DISTRICT provide?

FLOWING WELLS IRRIGATION DISTRICT sources its water from groundwater. Groundwater is pumped from underground aquifers, which often provides natural filtration. The utility's system ID is AZ0410051.

How does FLOWING WELLS IRRIGATION DISTRICT compare to other utilities in Arizona?

FLOWING WELLS IRRIGATION DISTRICT scores 0/100 with a grade of F (failing). This score suggests significant water quality concerns relative to other utilities. Visit our Arizona state page for a full comparison of water systems.