F0/100

Magnolia Tap Water Quality: Is It Safe to Drink? (2026 Report)

Serving 5,229 residents · Mississippi

What's In Magnolia's Tap Water?

2
Contaminants Tested
1
Exceed EPA Limits
0
Above EPA Goals
1 contaminant above EPA health goals
ContaminantDetectedLimit (MCL)Status
Copper (90th percentile)
1.82 mg/L1.30 mg/LOver Limit

EPA Violation History

68

Violations (last 5yr)

24

Unresolved

1

Health-Related

TIER 3Resolved

Monitoring Violation

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: October 1, 2025 – October 31, 2025Rule: Total Coliform RuleEnforcement: Resolving — corrective action underway
TIER 3Unresolved

Exceeded the MCL for disinfection byproducts

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: July 1, 2025 – September 30, 2025Rule: Revised Total Coliform RuleEnforcement: Informal — resolved cooperativelyVerify on EPA.gov
TIER 3Unresolved

Exceeded the MCL for disinfection byproducts

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: July 1, 2025 – September 30, 2025Rule: Revised Total Coliform RuleEnforcement: Informal — resolved cooperativelyVerify on EPA.gov
TIER 3Unresolved

Exceeded the MCL for disinfection byproducts

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: July 1, 2025 – September 30, 2025Rule: Revised Total Coliform RuleEnforcement: Informal — resolved cooperativelyVerify on EPA.gov
TIER 3Unresolved

Exceeded the MCL for disinfection byproducts

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: July 1, 2025 – September 30, 2025Rule: Revised Total Coliform RuleEnforcement: Informal — resolved cooperativelyVerify on EPA.gov
TIER 3Unresolved

Exceeded the MCL for disinfection byproducts

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: July 1, 2025 – September 30, 2025Rule: Revised Total Coliform RuleEnforcement: Informal — resolved cooperativelyVerify on EPA.gov
TIER 3Unresolved

Exceeded the MCL for disinfection byproducts

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: July 1, 2025 – September 30, 2025Rule: Revised Total Coliform RuleEnforcement: Informal — resolved cooperativelyVerify on EPA.gov
TIER 3Unresolved

Exceeded the MCL for disinfection byproducts

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: July 1, 2025 – September 30, 2025Rule: Revised Total Coliform RuleEnforcement: Informal — resolved cooperativelyVerify on EPA.gov
TIER 3Unresolved

Exceeded the MCL for disinfection byproducts

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: July 1, 2025 – September 30, 2025Rule: Revised Total Coliform RuleEnforcement: Informal — resolved cooperativelyVerify on EPA.gov
TIER 3Unresolved

Exceeded the MCL for disinfection byproducts

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: July 1, 2025 – September 30, 2025Rule: Revised Total Coliform RuleEnforcement: Informal — resolved cooperativelyVerify on EPA.gov
TIER 3Unresolved

Exceeded the MCL for disinfection byproducts

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: July 1, 2025 – September 30, 2025Rule: Revised Total Coliform RuleEnforcement: Informal — resolved cooperativelyVerify on EPA.gov
TIER 3Unresolved

Exceeded the MCL for disinfection byproducts

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: July 1, 2025 – September 30, 2025Rule: Revised Total Coliform RuleEnforcement: Informal — resolved cooperativelyVerify on EPA.gov
TIER 3Unresolved

Exceeded the MCL for disinfection byproducts

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: July 1, 2025 – September 30, 2025Rule: Revised Total Coliform RuleEnforcement: Informal — resolved cooperativelyVerify on EPA.gov
TIER 3Unresolved

Exceeded the MCL for disinfection byproducts

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: July 1, 2025 – September 30, 2025Rule: Revised Total Coliform RuleEnforcement: Informal — resolved cooperativelyVerify on EPA.gov
TIER 3Unresolved

Exceeded the MCL for disinfection byproducts

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: July 1, 2025 – September 30, 2025Rule: Revised Total Coliform RuleEnforcement: Informal — resolved cooperativelyVerify on EPA.gov
TIER 3Unresolved

Exceeded the MCL for disinfection byproducts

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: July 1, 2025 – September 30, 2025Rule: Revised Total Coliform RuleEnforcement: Informal — resolved cooperativelyVerify on EPA.gov
TIER 3Unresolved

Exceeded the MCL for disinfection byproducts

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: July 1, 2025 – September 30, 2025Rule: Revised Total Coliform RuleEnforcement: Informal — resolved cooperativelyVerify on EPA.gov
TIER 3Unresolved

Exceeded the MCL for disinfection byproducts

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: July 1, 2025 – September 30, 2025Rule: Revised Total Coliform RuleEnforcement: Informal — resolved cooperativelyVerify on EPA.gov
TIER 3Unresolved

Exceeded the MCL for disinfection byproducts

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: July 1, 2025 – September 30, 2025Rule: Revised Total Coliform RuleEnforcement: Informal — resolved cooperativelyVerify on EPA.gov
TIER 3Unresolved

Exceeded the MCL for disinfection byproducts

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: July 1, 2025 – September 30, 2025Rule: Revised Total Coliform RuleEnforcement: Informal — resolved cooperativelyVerify on EPA.gov
TIER 3Unresolved

Exceeded the MCL for disinfection byproducts

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: July 1, 2025 – September 30, 2025Rule: Revised Total Coliform RuleEnforcement: Informal — resolved cooperativelyVerify on EPA.gov
TIER 3Unresolved

Exceeded the MCL for disinfection byproducts

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: July 1, 2025 – September 30, 2025Rule: Revised Total Coliform RuleEnforcement: Informal — resolved cooperativelyVerify on EPA.gov
TIER 2Resolved

Treatment technique violation

When: October 17, 2024 – March 24, 2025Rule: Ground Water RuleEnforcement: Resolving — corrective action underway
TIER 3Resolved

Reporting violation

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: October 17, 2024 – March 24, 2025Rule: Ground Water RuleEnforcement: Resolving — corrective action underway
TIER 3Unresolved

Failed Level 2 Assessment under Revised Total Coliform Rule

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: October 1, 2024 – December 31, 2024Rule: Stage 1 DBPREnforcement: Informal — resolved cooperativelyVerify on EPA.gov
TIER 3Resolved

Exceeded the MCL for disinfection byproducts

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: July 1, 2024 – September 30, 2024Enforcement: Resolving — corrective action underway
TIER 3Resolved

Exceeded the MCL for disinfection byproducts

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: July 1, 2024 – September 30, 2024Enforcement: Resolving — corrective action underway
TIER 3Resolved

Exceeded the MCL for disinfection byproducts

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: July 1, 2024 – September 30, 2024Enforcement: Resolving — corrective action underway
TIER 3Resolved

Exceeded the MCL for disinfection byproducts

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: July 1, 2024 – September 30, 2024Enforcement: Resolving — corrective action underway
TIER 3Resolved

Exceeded the MCL for disinfection byproducts

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: July 1, 2024 – September 30, 2024Enforcement: Resolving — corrective action underway
TIER 3Resolved

Exceeded the MCL for disinfection byproducts

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: July 1, 2024 – September 30, 2024Enforcement: Resolving — corrective action underway
TIER 3Resolved

Exceeded the MCL for disinfection byproducts

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: July 1, 2024 – September 30, 2024Enforcement: Resolving — corrective action underway
TIER 3Resolved

Exceeded the MCL for disinfection byproducts

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: July 1, 2024 – September 30, 2024Enforcement: Resolving — corrective action underway
TIER 3Resolved

Exceeded the MCL for disinfection byproducts

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: July 1, 2024 – September 30, 2024Enforcement: Resolving — corrective action underway
TIER 3Resolved

Exceeded the MCL for disinfection byproducts

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: July 1, 2024 – September 30, 2024Enforcement: Resolving — corrective action underway
TIER 3Unresolved

Failed Level 2 Assessment under Revised Total Coliform Rule

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: January 1, 2024 – December 31, 2024Rule: Stage 2 DBPREnforcement: Informal — resolved cooperativelyVerify on EPA.gov
TIER 3Unresolved

Failed Level 2 Assessment under Revised Total Coliform Rule

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: January 1, 2024 – December 31, 2024Rule: Stage 2 DBPREnforcement: Informal — resolved cooperativelyVerify on EPA.gov
TIER 3Resolved

Exceeded the MCL for disinfection byproducts

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: July 1, 2023 – September 30, 2023Rule: Revised Total Coliform RuleEnforcement: Resolving — corrective action underway
TIER 3Resolved

Exceeded the MCL for disinfection byproducts

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: July 1, 2023 – September 30, 2023Rule: Revised Total Coliform RuleEnforcement: Resolving — corrective action underway
TIER 3Resolved

Exceeded the MCL for disinfection byproducts

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: July 1, 2023 – September 30, 2023Rule: Revised Total Coliform RuleEnforcement: Resolving — corrective action underway
TIER 3Resolved

Exceeded the MCL for disinfection byproducts

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: July 1, 2023 – September 30, 2023Rule: Revised Total Coliform RuleEnforcement: Resolving — corrective action underway
TIER 3Resolved

Exceeded the MCL for disinfection byproducts

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: July 1, 2023 – September 30, 2023Rule: Revised Total Coliform RuleEnforcement: Resolving — corrective action underway
TIER 3Resolved

Exceeded the MCL for disinfection byproducts

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: July 1, 2023 – September 30, 2023Rule: Revised Total Coliform RuleEnforcement: Resolving — corrective action underway
TIER 3Resolved

Exceeded the MCL for disinfection byproducts

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: July 1, 2023 – September 30, 2023Rule: Revised Total Coliform RuleEnforcement: Resolving — corrective action underway
TIER 3Resolved

Exceeded the MCL for disinfection byproducts

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: July 1, 2023 – September 30, 2023Rule: Revised Total Coliform RuleEnforcement: Resolving — corrective action underway
TIER 3Resolved

Exceeded the MCL for disinfection byproducts

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: July 1, 2023 – September 30, 2023Rule: Revised Total Coliform RuleEnforcement: Resolving — corrective action underway
TIER 3Resolved

Exceeded the MCL for disinfection byproducts

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: July 1, 2023 – September 30, 2023Rule: Revised Total Coliform RuleEnforcement: Resolving — corrective action underway
TIER 3Resolved

Exceeded the MCL for disinfection byproducts

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: July 1, 2023 – September 30, 2023Rule: Revised Total Coliform RuleEnforcement: Resolving — corrective action underway
TIER 3Resolved

Exceeded the MCL for disinfection byproducts

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: July 1, 2023 – September 30, 2023Rule: Revised Total Coliform RuleEnforcement: Resolving — corrective action underway
TIER 3Resolved

Exceeded the MCL for disinfection byproducts

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: July 1, 2023 – September 30, 2023Rule: Revised Total Coliform RuleEnforcement: Resolving — corrective action underway
TIER 3Resolved

Exceeded the MCL for disinfection byproducts

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: July 1, 2023 – September 30, 2023Rule: Revised Total Coliform RuleEnforcement: Resolving — corrective action underway
TIER 3Resolved

Exceeded the MCL for disinfection byproducts

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: July 1, 2023 – September 30, 2023Rule: Revised Total Coliform RuleEnforcement: Resolving — corrective action underway
TIER 3Resolved

Exceeded the MCL for disinfection byproducts

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: July 1, 2023 – September 30, 2023Rule: Revised Total Coliform RuleEnforcement: Resolving — corrective action underway
TIER 3Resolved

Exceeded the MCL for disinfection byproducts

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: July 1, 2023 – September 30, 2023Rule: Revised Total Coliform RuleEnforcement: Resolving — corrective action underway
TIER 3Resolved

Exceeded the MCL for disinfection byproducts

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: July 1, 2023 – September 30, 2023Rule: Revised Total Coliform RuleEnforcement: Resolving — corrective action underway
TIER 3Resolved

Exceeded the MCL for disinfection byproducts

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: July 1, 2023 – September 30, 2023Rule: Revised Total Coliform RuleEnforcement: Resolving — corrective action underway
TIER 3Resolved

Exceeded the MCL for disinfection byproducts

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: July 1, 2023 – September 30, 2023Rule: Revised Total Coliform RuleEnforcement: Resolving — corrective action underway
TIER 3Resolved

Exceeded the MCL for disinfection byproducts

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: July 1, 2023 – September 30, 2023Rule: Revised Total Coliform RuleEnforcement: Resolving — corrective action underway
TIER 3Resolved

Disinfection byproduct treatment technique failure

When: February 19, 2023 – June 9, 2023Rule: Ground Water RuleEnforcement: Resolving — corrective action underway
TIER 3Resolved

Disinfection byproduct treatment technique failure

When: January 28, 2023 – June 22, 2023Rule: Ground Water RuleEnforcement: Resolving — corrective action underway
TIER 3Resolved

Disinfection byproduct treatment technique failure

When: January 19, 2023 – June 22, 2023Rule: Ground Water RuleEnforcement: Resolving — corrective action underway
TIER 3Resolved

Exceeded the MCL for disinfection byproducts

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: January 1, 2023 – December 31, 2023Enforcement: Resolving — corrective action underway
TIER 3Resolved

Disinfection byproduct treatment technique failure

When: December 4, 2022 – June 9, 2023Rule: Ground Water RuleEnforcement: Resolving — corrective action underway
TIER 3Resolved

Exceeded the MCL for disinfection byproducts

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: October 1, 2022 – December 31, 2022Enforcement: Resolving — corrective action underway
TIER 3Resolved

Exceeded the MCL for disinfection byproducts

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: July 1, 2022 – September 30, 2022Enforcement: Resolving — corrective action underway
TIER 3Resolved

Exceeded the MCL for disinfection byproducts

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: July 1, 2022 – September 30, 2022Enforcement: Resolving — corrective action underway
TIER 3Resolved

Failed to issue ongoing public notification

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: July 1, 2022 – October 26, 2023Rule: Ground Water RuleEnforcement: Resolving — corrective action underway
TIER 3Resolved

Failed to issue ongoing public notification

This is a paperwork/process violation — it does not mean a contaminant was detected at unsafe levels.

When: January 1, 2022 – October 26, 2023Rule: Ground Water RuleEnforcement: Resolving — corrective action underway

Understanding violation severity

Tier 1Urgent health risk. Utility must notify all customers within 24 hours.Tier 2Important health or treatment issue. Customers notified within 30 days.Tier 3Administrative or monitoring issue. Reported in the annual water quality report.

Source: EPA Safe Drinking Water Information System (SDWIS) · Updated quarterly

Water Utility Details

CITY OF MAGNOLIA
Population Served

2,307

Water Source

Groundwater

System ID

MS0570005

MAGNOLIA RURAL WATER ASSN
Population Served

2,922

Water Source

Groundwater

System ID

MS0570015

Frequently Asked Questions About Magnolia Water

Is Magnolia tap water safe to drink?

Magnolia, Mississippi tap water receives a grade of F (0/100), which is considered failing. 1 contaminant(s) exceed EPA maximum contaminant levels and 398 violation(s) are on record. Residents should consider using an NSF-certified water filter to reduce contaminant exposure.

What contaminants are in Magnolia's water?

Of the 2 contaminants tested in Magnolia's water supply, the most notable include Copper (90th percentile), Lead (90th percentile). 1 contaminant(s) exceed EPA legal limits (MCLs). 2 contaminant(s) exceed EPA health goals (MCLGs), which are non-enforceable targets set at levels with no known health risk.

Does Magnolia have any water quality violations?

Yes, Magnolia has 398 EPA violation(s) on record, with the most recent in 2025. Violation types include MON, MR, RPT. 5 of these are health-based violations, which are the most serious category.

Do I need a water filter in Magnolia?

Based on EPA data, using a water filter in Magnolia is recommended. 1 contaminant(s) exceed legal limits. An NSF-certified filter — such as a reverse osmosis or activated carbon system — can effectively reduce many common contaminants. Choose a filter certified to remove the specific contaminants found in your area.

Where does Magnolia's tap water come from?

Magnolia's drinking water is sourced from groundwater and supplied by CITY OF MAGNOLIA and 1 other water system(s). The system serves approximately 5,229 people. Groundwater is pumped from underground aquifers, which often provides natural filtration.

How often is Magnolia's water tested?

Under the Safe Drinking Water Act (SDWA), water utilities are required to regularly test for over 90 contaminants. Testing frequency varies by contaminant — some are tested monthly, others quarterly or annually. Magnolia's water systems must report results to the EPA and publish an annual Consumer Confidence Report (CCR). The data on this page reflects the latest available EPA testing data.

How does Magnolia's water compare to other cities in Mississippi?

Magnolia's water quality score of 0/100 earns a grade of F, which is considered failing. This is a concerning score that suggests significant water quality issues. Visit our Mississippi state page to see how all cities in the state compare.

What should I do if I'm concerned about Magnolia's water quality?

If you have concerns about Magnolia's tap water, consider these steps: (1) Request your utility's annual Consumer Confidence Report for detailed local data. (2) Get your water independently tested through a state-certified laboratory. (3) Consider an NSF-certified water filter rated for the contaminants found in your area. (4) Contact your water utility (CITY OF MAGNOLIA) with specific questions. (5) Report water quality issues to your state drinking water program or the EPA Safe Drinking Water Hotline at 800-426-4791.

Nearby Cities in Mississippi